Type : Bid Notification
Removal and storage of “sections of chain link fence” necessary to modify and repair retention pond 2. Modify existing pond as shown in SITE PLAN 3. Install wet swale to retention pond as noted in storm water plan and shown in SITE PLAN 2 4. Install inlet invert as shown in SITE PLAN 5. Install outlet invert as shown in SITE PLAN 6. Within the ellipse, contractor shall install bottom within range as shown in SITE PLAN 7.