Type : Bid Notification
EARLSSee AllEmailSolicitation SummaryARCHITECTURAL/ENGINEERING DESIGN SERVICES INDEFINITE DELIVERY, INDEFINITE QUANTITY CONTRACT (IDIQ)Additional InstructionsPlease see attachment.
EARLSSee AllEmailSolicitation SummaryARCHITECTURAL/ENGINEERING DESIGN SERVICES INDEFINITE DELIVERY, INDEFINITE QUANTITY CONTRACT (IDIQ)Additional InstructionsPlease see attachment.
Using the information from those important community conversations — and from the recently completed Downtown Vision Plan (as it aligns with our current Comprehensive Plan), the consultant would draft proposed amendments to the Design Review Ordinance to include: clear and prescriptive standards using a combination of text and graphics; standards that would consider modern day technologies, materials and Code requirements; an efficient and streamlined
(See 765-80 for Non-Pneumatic Tampers) 90607 - Architect Services, Professional 90610 - Buildings - Architectural Design 90625 - Design Build Services 90638 - General Construction - Architectural 90646 - Highways; Streets; Airport Pay-Parking Lots - Architectural 90674 - Recycling Systems - Architectural Design 90735 - Designing Services 90910 - Airport Facility Construction 91394 - Paving/Resurfacing, Alley and Parking Lot 91396 - Paving/Resurfacing
BackgroundIn the conversation of this house into a Fire Station, the County is need of a firm to design a radio system. This design should include the following: 70V Audio System; Integrated Radio System Infrastructure; and VHF Paging Alerting System. See the Scope of Work for more details regarding the needed system.
Id3169Posting TypeRFIPosting Published01-Apr-2024Posting Close01-May-2024 16:00Current Time (Albuquerque NM)28-Apr-2024 02:05NAICS541512: Computer Systems Design ServicesBusiness Size Standard$34MEstimated Period of Performance3 years AROCompetition TypeN/A for RFITitleAdvanced Memory TechnologyAttachmentsClick the link in the Title column to open the attachment.Seq function _tableSortSubmit(formName,validate,sortEvent,table,val,stat,ptgt,parent)
The consultant should anticipate typical future projects may include work on storm drain infrastructure, bridge maintenance, erosion control projects, emergency storm response projects, roadway construction and reconstruction design, sidewalk and curb ramp design, and parking lot maintenance projects The following is an outline of the anticipated schedule for proposal review and contract award: Issue RFQ ...........................................
*****Request for Information (RFI)Savannah River Nuclear Solutions, LLC (SRNS), which manages and operates portions of the Savannah River Site (SRS) under a Department of Energy (DOE) prime contract, seeks information from parties capable of design and build a mechanical assembly.