Search results for: riprap and approach

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 296
  • CHINO RANCH DAM NO. 1 RIPRAP PROJECT AT ARNOLD RESERVOIR

    Type : Bid Notification

    Due : 23 May, 2024 (in 17 days)
    Posted : 18 days ago
    Started : 16 Apr, 2024 (19 days ago)

    rap along the face of the dam from the existing spillway to the eastern end of the dam face.

    From: City of Hartford (City)

  • 0.01 mi of hot mix asphalt reconstruction, culvert replacement, approach work, cofferdams, riprap an...

    Type : Bid Notification

    Due : 06 Mar, 2020 (about 4 years ago)
    Posted : about 4 years ago
    Started : 07 Feb, 2020 (about 4 years ago)

    Proposal 64016-123163 0.01 mi of hot mix asphalt reconstruction, culvert replacement, approach work, cofferdams, riprap and pavement markings on US-31BR (Polk Road) over Russell Creek in the city of Hart, Oceana County. ** 1353 Ea or 1353 Fa **In addition to the above minimum prequalification requirement for prime contractors this project includes a subclassification of Fa.

    From: Michigan Department of Transportation (Transportation)

  • McLaren Miller Creek Repair Project

    Type : Bid Notification

    Due : 07 May, 2024 (in 1 day)
    Posted : 17 days ago
    Started : 17 Apr, 2024 (18 days ago)

    UOM Requested Service Delivery S1 Provide, Install, and Remove Silt Fence 300 LF - Linear Foot 8/5/2024 to 10/5/2024 Provide cost per linear foot 26 April 202426 April 202426 April 2024

    From: Montana (State)

  • Garrison Spillway Approach Dredge

    Type : Bid Notification

    Due : 10 Apr, 2024 (24 days ago)
    Posted : 1 month ago
    Started : 07 Mar, 2024 (1 month ago)

    Originally the east channel bank below the berm at elevation 1865 was protected with 2 feet of riprap placed over 1 foot of spalls that was underlain by 1 foot of gravel filter blanket.The slope protection, as originally designed, extended from the spillway structure upstream a distance of approximately 1,400 feet. All but 300 feet of the slope protection was removed in 1975 for repairs on the Snake Creek embankment.

    From: Federal Government (Federal)

  • Mike Harris Bridge Replacement

    Type : Pre-Bid Notification

    Due : 11 Jun, 2024 (in 1 month)
    Posted : 11 days ago
    Started : 23 Apr, 2024 (11 days ago)

    The Teton Basin Ranger District has secured funding to replace the bridge with a new structure that will meet current and future needs. The old bridge will be removed and disposed of. The stream channel will be reconstructed with riprap installed to protect the substructure of the new bridge while maintaining and restoring the natural stream channel and surrounding riparian area.

    From: Federal Government (Federal)

  • Deck replacement, full painting, substructure repair, riprap placement, approach work and maintainin...

    Type : Bid Notification

    Due : 06 Oct, 2023 (7 months ago)
    Posted : 8 months ago
    Started : 01 Sep, 2023 (8 months ago)

    See more details...

    From: Michigan Department of Transportation (State)

  • Bridge reconstruction including removal and replacement, riprap and approach work on 96th Avenue ove...

    Type : Bid Notification

    Due : 03 Mar, 2023 (14 months ago)
    Posted : 15 months ago
    Started : 03 Feb, 2023 (15 months ago)

    See more details...

    From: Michigan Department of Transportation (State)