Search results for: road and gary

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 1,392
  • Gary Road Bridge Repair

    Type : Bid Notification

    Due : 06 Jul, 2023 (9 months ago)
    Posted : 10 months ago
    Started : 05 Jun, 2023 (10 months ago)

    The contract Documents are on file and may be examined or purchased at the following locations: 5901 Terry Road, Byram, Mississippi 39272.

    From: City of Byram (City)

  • Tefft Hill Road Reclamation and Paving

    Type : Bid Notification

    Due : 09 May, 2024 (in 19 days)
    Posted : 6 days ago
    Started : 12 Apr, 2024 (7 days ago)

    Bid Title:Tefft Hill Road Reclamation and Paving Category:Public WorksStatus:Open Description: See attached "related documents" Publication Date/Time: 4/12/2024 3:15 PM Closing Date/Time: 5/9/2024 10:00 AM Contact Person: DPW Director Gary Robar - 401-539-8474 Plan Holders List: N/A Related Documents: Tefft Hill Rd RFP 041124 Tefft Hill Rd. Specs Return To Main Bid Postings Page

    From: Richmond (Town)

  • PEDESTRIAN HYBRID BEACON AT THE INTERSECTION OF STADIUM ROAD AND GARY LANE CDBG

    Type : Bid Notification

    Due : 04 Feb, 2021 (about 3 years ago)
    Posted : about 3 years ago
    Started : 20 Jan, 2021 (about 3 years ago)

    The work in general consists of installation of a new pedestrian hybrid beacon at the intersection of Stadium Road and Gary Lane including signal poles, electrical control cabinet, American with Disability Act (ADA) curb ramps, traffic striping and markings, and minor asphalt concrete plug paving. To attend the VIRTUAL BID OPENING via ZOOM on TH...

    From: Madera (City)

  • RFP 24-19 PHASE III CONSTRUCTION RESIDENT ENGINEER GARY AVENUE BETWEEN JEWELL ROAD AND HARRISON AVENUE

    Type : Bid Notification

    Due : 06 Feb, 2024 (2 months ago)
    Posted : 3 months ago
    Started : 16 Jan, 2024 (3 months ago)

    Bid Details Planholder RFP 24-19 PHASE III CONSTRUCTION RESIDENT ENGINEER GARY AVENUE BETWEEN JEWELL ROAD AND HARRISON AVENUE Active Browse Awarded Bids Download Bid Package Bid Details Agency Name City of Wheaton Bid Writer Tina Walters Bid ID RFP-RFP 24-19-0-2024/TW Bid Type RFP - Request for Proposal Broadcast Date 01/16/2024 8:26 AM Central Fiscal Year 2024 Due Date 02/06/2024 12:00 PM Central Bid Status Text None Additional Registration (NEW)

    From: City of Wheaton (City)

  • RFP 24-19 PHASE III CONSTRUCTION RESIDENT ENGINEER GARY AVENUE BETWEEN JEWELL ROAD AND HARRISON AVE

    Type : Bid Notification

    Due : 06 Feb, 2024 (2 months ago)
    Posted : 3 months ago
    Started : 16 Jan, 2024 (3 months ago)

    Bid Number:RFP 24-19 Bid Title:RFP 24-19 PHASE III CONSTRUCTION RESIDENT ENGINEER GARY AVENUE BETWEEN JEWELL ROAD AND HARRISON AVE Category:City of Wheaton Bids - Professional Services & ConsultingStatus:Open Publication Date/Time: 1/16/2024 12:00 AM Closing Date/Time: 2/6/2024 12:00 PM Related Documents: RFP 24-19 PH 3 Eng Services for Gary AvenueAddendum 1 Attachment 1_Addendum 1-2023.11.16_DW_TEG_Gary Avenue_Prefinal Plans Attachment 2_Addendum

    From: Wheaton (City)

  • Gary Road Improvements Empire Boulevard to Combs/Riggs Road

    Type : Bid Notification

    Due : 30 Jun, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 28 May, 2020 (about 3 years ago)

    The work consists of removing asphaltic concrete; installing aggregate base course, asphaltic concrete, and geogrid; scuppers, catch basins and storm drain; drainage excavation; signing and marking; decomposed granite; minor modifications and other related work. Bid Number: 201021 Published Date: May 28th 2020, 8:00 AM MST Due Date:Jun 30th 2020, 2:00 PM MST

    From: Pinal (County)

  • City of Gary Preliminary Engineering and Right-of-Way Services for Airport Road Relocation from 1.0 mile east of Cline Ave

    Type : Bid Notification

    Due : 10 Jan, 2024 (3 months ago)
    Posted : 5 months ago
    Started : 26 Dec, 2023 (3 months ago)

    City of Gary Preliminary Engineering and Right-of-Way Services for Airport Road Relocation from 1.0 mile east of Cline Ave (SR 912) interchange to 1.7 mile east of Cline Ave (SR 912) interchange (Des # 2300662) in the Laporte District. Response Due Date & Time: January 10, 2024 at 2:00pm CST This Request for Proposals (RFP) is official notification of needed professional services.

    From: Indiana Department of Transportation (Transportation)