Type : Bid Notification
Site #2 - Tizer Road # Item Name, Commodity Code, Description Allow Alternates Qty.
Site #2 - Tizer Road # Item Name, Commodity Code, Description Allow Alternates Qty.
Site #2 - Tizer Road # Item Name, Commodity Code, Description Allow Alternates Qty.
Contract summary Requires removal of the existing mini-roundabout, re-orientating ramps to connect closer to the bridge overpass, installing a new multi-lane roundabout, road excavation, planing, pigmented concrete installation, paving, curb installation, stormwater work, traffic control and other work. Involves 103 items and 70 working days. Work class 1.
he Contractor will construct a multi-use trail along the east side of Rogers Bridge Road between Bell Road and Kemper Drive, a multi-use trail along the south side of Bell Road between Cauley Creek Park and Rogers Bridge Road, and a rectangular rapid flashing beacon (RRFB) crossing at the intersection of Rogers Bridge Road and Amberleigh Way.
Description (Helena Area Roads) Unit Estimated Quantity Unit Price Extended Price 101 Birdseye Road: 2nd RR Track to Austin Road LF 5,160 102 Birdseye Road: Austin Road to Three Mile Road LF 6,000 103 Valley Dr.: York Road to Howard Road LF 840 104 Valley Dr.: Howard Road to Canyon Ferry Road LF 3,696 105 Herrin Road.: York Road to Wylie Drive LF 960 106 Tizer Drive: York Road to Birkland Drive LF 2,640 107 North Mt.
Response Log IFB 6100 CLMC997 Teri Rd and Pleasant Valley Rd Roundabout Construction of a roundabout at Teri Road and Pleasant Valley intersection. project. Solicitation Basic Information Link to Solicitation View Solicitation Status Closed Solicitation Number IFB 6100 CLMC997 Description Teri Rd and Pleasant Valley Rd Roundabout Summary Construction of a roundabout at Teri Road and Pleasant Valley intersection. project.
All 823 Intermediate Course material shall be placed as directed by the Engineer prior to placement of any 823 Surface Course material on a road by road basis. No construction traffic shall be permitted over the material until sufficient cooling has occurred to support such traffic.