  • River Road Widening Utility Relocation

    Type : Bid Notification

    Due : 09 Jan, 2023 (16 months ago)
    Posted : 16 months ago
    Started : 25 Dec, 2022 (16 months ago)

    Plan Sheets.pdfDocumentationB-River Road Plan SheetsDec 21st 2022, 10:05 AM EST - Bid Schedule-River Road Widening Utility Relocation.xlsxDocumentationBid Schedule-River Road Widening Utility RelocationDec 21st 2022, 10:11 AM EST - C-Transmission Removal Exhibit A.pdfDocumentationC-Transmission Removal Exhibit ADec 21st 2022, 10:00 AM EST - Certifications Forms.pdfDocumentationCertifications FormsDec 21st 2022, 3:39 PM EST - D-Special Note for Tree

    From: Louisville (City)

  • River Road Widening Tree Removal for Utility Relocations

    Type : Bid Notification

    Due : 24 Jan, 2024 (3 months ago)
    Posted : 3 months ago
    Started : 09 Jan, 2024 (3 months ago)

    The project titled “River Road Widening Tree Removal for Utility Relocations” includes tree removal and restoration on River Road from Beargrass Creek to Zorn Ave. Bidders and DBE subcontractors must be prequalified with the Kentucky Transportation Cabinet and possess a Certificate of Eligibility at the time of the bid opening. All other subcontractors must be prequalified when accepting subcontracts.

    From: Louisville (City)

  • Roadway and Drainage Improvements

    Type : Bid Notification

    Due : 28 Jul, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 30 Jun, 2020 (about 3 years ago)

    Approximately 400 tons of asphalt paving, 1,700 linear feet curb and gutter, 1,175 linear feet 18-inch storm pipe, 290 linear feet 24-inch storm pipe, 405 linear feet 36‐inch storm pipe, grading, demolition, road widening, utility relocation, and all appurtenances associated with project construction. Time allotted for construction is 180 consecutive calendar days for substantial completion and 210 days for final completion.

    From: Georgia Local Government (Other)

  • Shoals Street Drainage and Street Improvements

    Type : Bid Notification

    Due : 23 Jul, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 21 Jun, 2021 (about 2 years ago)

    The work to be done consists of furnishing all materials, equipment and labor for the construction of: Approximately 387 tons of asphalt paving, 1,649 linear feet curb and gutter, 1,475 square yards concrete sidewalk, 792 linear feet 18-inch storm pipe, 672 linear feet 24-inch storm pipe, 78 linear feet 36 inch storm pipe, grading, demolition, road widening, utility relocation, and all appurtenances associated with project construction.

    From: Georgia (State)

  • City of Warrenton Roadway and Drainage Improvement

    Type : Bid Notification

    Due : 28 Jul, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 24 Jun, 2020 (about 3 years ago)

    The work to be done consists of furnishing all materials, equipment and labor for the construction of: Approximately 400 tons of asphalt paving, 1,700 linear feet curb and gutter, 1,175 linear feet 18-inch storm pipe, 290 linear feet 24-inch storm pipe, 405 linear feet 36 inch storm pipe, grading, demolition, road widening, utility relocation, and all appurtenances associated with project construction. .

    From: Georgia (State)

  • Reel Road Widening - Contract 1 Utility Relocations

    Type : Bid Notification

    Due : N/A
    Posted : 10 months ago
    Started : 28 May, 2023 (11 months ago)

    Details ID: LV-19-02 Estimate: $1,895,000 Type: Public works water and sewer relocations Owner: City of Longview, Tx Location Gregg County, TX Map Code: Show Google Map Open Map On Google No Map Scope The project consists of constructing approximately 5,574 LF of 6”-12” water main and 4,441 LF of 6”-8” sanitary sewer and related appurtenances. Pre-Bid Details Date: 6/26/2023 Time: 2:00 PM Location: Public Works Service Center, 233 Mobile Drive, Longview, TX Notes: Bid Details Date: 7/11/2023 TBA Time: 2:00 PM CST Location: Public Works Service Center, 233 Mobile Drive, Longview, TX Notes: Contact Address Hayes Engineering, Inc. 2126 Alpine Rd. Longview, Texas 75601 Contact Info Contact: Stan Hayes Phone: 903-758-2010 x 22 Fax: 903-758-2099 ...

    From: Hayes Engineering Inc (Co-op)

  • UTILITY CONFLICT RESOLUTION FDOT US 41 WIDENING

    Type : Bid Notification

    Due : 20 Dec, 2017 (about 6 years ago)
    Posted : about 6 years ago
    Started : 17 Nov, 2017 (about 6 years ago)

    This work is intended to be constructed under a separate utility construction contract than the planned FDOT US-41 Road Widening project (by Others), although work sequence for these various NPU utility relocations will be coordinated with planned FDOT construction phases associated with the road widening project. The work includes furnishing labor, materials, equipment, services, and incidentals for this pipeline relocation project.

    From: North Port (City)