Type : Bid Notification
RIP RAP LIMESTONE ROCK AT ST MARKS NWR FL
RIP RAP LIMESTONE ROCK AT ST MARKS NWR FL
Fish and Wildlife Service, St Marks NWR, St Marks FL has a requirement for lime rock (road base) and delivery as per attached SOW. The anticipated required delivery date is December 2022 or sooner.
EXCAVATION SHALL BE “CLASSIFIED” AS “COMMON EXCAVATION” OR “ROCK EXCAVATION”. a. COMMON EXCAVATION IS REMOVING OF MATERIALS BY MEANS OF RIPPING AND DO NOT FALL IN THE CATEGORY OF ROCK EXCAVATION AS DEFINED ABOVE (INCLUDES BOULDERS, TYPICAL WEATHERED ROCK, ETC.). b. ROCK EXCAVATION IS CLASSIFIED AS: i.
Mark and Post: The property boundary line segments to be marked on the ground for the purpose of perpetuating such line(s).
The stone shall be inverted and set below ground level to avoid any uncertainty as to whether the new corner post or the old rock monument now marks the true corner point location. In the event that a corner has been previously and accurately monumented with a satisfactory brass cap, aluminum cap, concrete monument, or other approved monument, the setting of a new monument will not be necessary.
Mark and label all packaging and packing in accordance with MIL-STD-129. The Unit of Issue (U/I) and Quantity per Unit Pack (QUP) will be as specified in the contract/purchase order. PALLETIZATION SHALL BE IN ACCORDANCE WITH RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT BULK BREAK POINT: W41RAB W8TM AR ARNG CSMS 1 4630 6TH ST CAMP ROBINSON NORTH LITTLE ROCK AR 72199-9600 US RDD(3-POS RDD)/NMCS SHIPMENT. SHIP BY FASTAST TRACEABLE MEANS.
Contract #23-60: Bulk Rock Salt All bids are to be emailed to bids@kentcountyroads.net, with the subject “Contract #23-60: Bulk Rock Salt” and must be received prior to 8:30 AM on Tuesday, June 20, 2023.