Search results for: rooftop units modifications

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 22
  • Reroofing and Rooftop Units Modifications

    Type : Bid Notification

    Due : 13 Apr, 2023 (12 months ago)
    Posted : 13 months ago
    Started : 30 Mar, 2023 (13 months ago)

    Request for Qualifications (Architect / Engineer) State of Ohio Standard Forms and Documents F110-02-2022-MAR Publish Date: 3/30/2023 Page 1 of 4 Administration of Project: Local Agency Project Name Reroofing and Rooftop Units Modifications Response Deadline April 13, 2023 2:00pm local time Project Location NW Ohio Psychiatric Hospital Project Number DMH-230003 City / County Toledo / Lucas Project Manager Kevin Russell Owner Ohio Dept of Mental Health

    From: Ohio Facilities Construction Commission (State)

  • Lafayette Branch Library HVAC Rehabilitation

    Type : Bid Notification

    Due : 22 Feb, 2023 (14 months ago)
    Posted : 15 months ago
    Started : 27 Jan, 2023 (15 months ago)

    SummaryThe project shall consist of the removal of the ceiling, replacement of the Rooftop units with modifications to the ductwork, replacement of the lighting and ceiling tiles. 2.

    From: Norfolk (City)

  • CARE HVAC Systems Renovations – Phase 2, Egbert, Ontario

    Type : Bid Notification

    Due : 25 Jul, 2023 (9 months ago)
    Posted : 9 months ago
    Started : 05 Jul, 2023 (9 months ago)

    Public Works and Government Services Canada (PWGSC), on behalf of Environment and Climate Change Canada requires a qualified contractor to provide construction services including the removal of existing roof top units (RTUs), demolition of the portions of the ductwork, installation of the new rooftop units, modification of existing ductwork, supply of new packed high-efficiency rooftop air conditioning units, new building automation control system

    From: MerX (Federal)

  • CARE HVAC Systems Renovations – Phase 2, Egbert, Ontario

    Type : Bid Notification

    Due : 14 Aug, 2023 (8 months ago)
    Posted : 8 months ago
    Started : 05 Jul, 2023 (9 months ago)

    Public Works and Government Services Canada (PWGSC), on behalf of Environment and Climate Change Canada requires a qualified contractor to provide construction services including the removal of existing roof top units (RTUs), demolition of the portions of the ductwork, installation of the new rooftop units, modification of existing ductwork, supply of new packed high-efficiency rooftop air conditioning units, new building automation control system

    From: Canada (Federal)

  • North Campus Building N101 HVAC Upgrades

    Type : Bid Notification

    Due : 17 Feb, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 19 Jan, 2022 (about 2 years ago)

    The College is requesting a cost to remove several existing mezzanine units (refer to plans) and replace with a single unit. The contractor shall be responsible for coordinating the removal and replacement of all listed rooftop units as well as modifications to ductwork, electrical service and control integration.

    From: North Carolina Rowan Cabarrus Community College (Higher Education)

  • Rowan-Cabarrus Community College North Campus Building N101 HVAC Upgrades, Phase I

    Type : Bid Notification

    Due : 16 Sep, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 09 Sep, 2021 (about 2 years ago)

    The contractor shall be responsible for coordinating the removal and replacement of all listed rooftop units as well as modifications to ductwork, electrical service and control integration. Once installed, the equipment shall be air balance and performance tested by a NEBB certified TAB agent; reports indicating airflow test, coil performance and details shall be provided for review by Owner prior to closeout.

    From: North Carolina Rowan Cabarrus Community College (Higher Education)

  • Centralia College - Multiple Buildings Roof Replacement & Repair

    Type : Bid Notification

    Due : 10 Sep, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 23 Aug, 2020 (about 3 years ago)

    Work on Hanson Hall also includes removal of the existing packaged rooftop heat pumps and installation of new Variable Refrigerant Flow (VRF) system, and rooftop-mounted Dedicated Outside Air System (DOAS) unit, and related modifications.

    From: Abadan Reprographics and Imaging (Other)