Search results for: room equipment and continuity

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 238
  • 2024 Telecom Room Equipment Continuity

    Type : Bid Notification

    Due : 16 Apr, 2024 (14 days ago)
    Posted : 1 month ago
    Started : 12 Mar, 2024 (1 month ago)

    2024 Telecom Room Equipment Continuity2024 Telecom Room Equipment Continuity Construction Bid Notice MSP Airport April 16, 2024 View

    From: Metropolitan Airports Commission (Airport)

  • U.S. Government Seeks to Lease Office and Related Space in Fort Wayne, Indiana

    Type : Pre-Bid Notification

    Due : 10 Apr, 2024 (19 days ago)
    Posted : about 2 years ago
    Started : 08 Apr, 2024 (21 days ago)

    file room (requested 210 sq. ft.), interview room with recording/camera equipment (requested 140 sq. ft.), a secure file/storage room (requested 392 sq. ft.) and a tactical equipment storage room (requested 210 sq. ft.).HSI/ERO have also requested a shared fitness suite (requested 1,456 sq. ft.), break room (requested 280 sq. ft.) and conference room (requested 420 sq. ft.).HSI will require an IT/Telecom Suite (requested 280 sq. ft.) and ERO will

    From: Federal Government (Federal)

  • Z--Replace Steam & Condensate Mains Oval 2 & Outlying Branches

    Type : Bid Notification

    Due : 30 May, 2018 (about 6 years ago)
    Posted : about 6 years ago
    Started : 10 May, 2018 (about 6 years ago)

    Some reconfiguration of service room equipment is required to accomplish the work, including the addition of equipment platforms.The work includes all associated architectural, structural, mechanical, electrical and control work. It also includes temporary/portable steam generator service, temporary piping connections and any associated site restoration.

    From: Federal Government (Federal)

  • Nursing Clinical Simulation training

    Type : Bid Notification

    Due : 23 Oct, 2023 (6 months ago)
    Posted : 6 months ago
    Started : 06 Oct, 2023 (6 months ago)

    Simulation-based medical training will also support the nurses with early identification of patient deterioration and intervention to prevent emergency situations from occurring. • The scope of this contract includes, but is not limited to, simulation time including rooms and equipment, set up and clean up, technical support, instructors and consumables (including but not limited to injection equipment, dressing materials) See Annex A “Statement of

    From: MerX (Federal)

  • Nursing Clinical Simulation training

    Type : Bid Notification

    Due : 23 Oct, 2023 (6 months ago)
    Posted : 6 months ago
    Started : 06 Oct, 2023 (6 months ago)

    Simulation-based medical training will also support the nurses with early identification of patient deterioration and intervention to prevent emergency situations from occurring. • The scope of this contract includes, but is not limited to, simulation time including rooms and equipment, set up and clean up, technical support, instructors and consumables (including but not limited to injection equipment, dressing materials) See Annex A “Statement of

    From: Canada (Federal)

  • Notice of Intent to Sole Source-HVAC

    Type : Bid Notification

    Due : 07 Sep, 2018 (about 5 years ago)
    Posted : about 5 years ago
    Started : 23 Aug, 2018 (about 5 years ago)

    The anticipated period of performance is from date of award (estimated September 12, 2018) through September 11, 2023 for with no option periods.NOAA requires construction services in Fibrebond structures, to provide HVAC equipment replacement primarily for the National Weather Service Central Region Headquarters' (38) thirty-eight Weather Forecast Offices Equipment Room and co-located Radar Data Acquisition (RDA) Sites in the following 14 states:

    From: Federal Government (Federal)

  • FAA Office of Security & Hazardous Materials Safety - Primary Alternate Facility (PAF)- A/C Replacement

    Type : Pre-Bid Notification

    Due : 15 Nov, 2017 (about 6 years ago)
    Posted : about 6 years ago
    Started : 26 Oct, 2017 (about 6 years ago)

    The Federal Aviation Administration (FAA) is seeking experienced interested parties to provide services in support of maintaining a FAA Continuity of Operations (COOP) site, referred to as the Primary Alternate Facility (PAF). The PAF services required is to replace an existing cooling system that cools a 2700 cubic feet room with computer equipment and servers.

    From: Federal Government (Federal)