Search results for: room hvac control

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 3,498
  • HVAC System Unit Replacements

    Type : Bid Notification

    Due : 01 May, 2024 (in 6 days)
    Posted : 14 days ago
    Started : 08 Apr, 2024 (16 days ago)

    Specifications Apr 4, 2024 Complete ELECTRONIC SUBMISSION INSTRUCTIONS Bid Document / Specifications Apr 3, 2024 Complete Distribution Info Bid Bond N/A Plan (blueprint) None eBidding Yes Distributed By DemandStar Distribution Method Download Distribution Options Bid has no blueprints associated with it Distribution Notes None Publications Business Gazette News Herald View Legal Ad Pre-Bid Conference NON-MANDATORY April 18, 2024 in the PW Training Room

    From: Lake Havasu City (City)

  • J--Repair Operating Room (OR) HVAC Controls

    Type : Bid Notification

    Due : 06 Mar, 2020 (about 4 years ago)
    Posted : about 4 years ago
    Started : 28 Feb, 2020 (about 4 years ago)

    SCOPE OF WORK This project will provide labor, materials, supervision and programming to repair/replace existing HVAC controls currently located in Area 2E, Bldg. 100 in addition to correct existing HVAC piping for AHU #16. Patient care will be affected without repair/replacement. AHU Unit and Controls service all eight (8) operating room suites and adjacent 2E support areas.

    From: Federal Government (Federal)

  • ITB #991 - HVAC EAST-SOUTHEAST: General Repairsand Boiler PM

    Type : Bid Notification

    Due : 26 Apr, 2024 (Tomorrow)
    Posted : 12 days ago
    Started : 28 Mar, 2024 (27 days ago)

    Time is measured from when assigned to the vendor until the vendor marks “in progress” (meaning that a technician is on site) in work order system Priority 1 work orders are generally to be used for a system failure that causes multiple rooms to lose HVAC. They are also used if there is a major event in a single room that requires immediate assistance.

    From: Columbus City (School)

  • ITB #995 - HVAC WEST SOUTH: General Repairs and Boiler PM

    Type : Bid Notification

    Due : 26 Apr, 2024 (Tomorrow)
    Posted : 12 days ago
    Started : 28 Mar, 2024 (27 days ago)

    Time is measured from when assigned to the vendor until the vendor marks “in progress” (meaning that a technician is on site) in work order system Priority 1 work orders are generally to be used for a system failure that causes multiple rooms to lose HVAC. They are also used if there is a major event in a single room that requires immediate assistance.

    From: Columbus City (School)

  • ITB#997 - HVAC WEST SOUTHEAST: General Repairs and Boiler PM

    Type : Bid Notification

    Due : 26 Apr, 2024 (Tomorrow)
    Posted : 7 days ago
    Started : 02 Apr, 2024 (22 days ago)

    Time is measured from when assigned to the vendor until the vendor marks “in progress” (meaning that a technician is on site) in work order system Priority 1 work orders are generally to be used for a system failure that causes multiple rooms to lose HVAC. They are also used if there is a major event in a single room that requires immediate assistance.

    From: Columbus City (School)

  • ITB #996 - HVAC WEST SOUTHWEST: General Repairs and Boiler PM

    Type : Bid Notification

    Due : 26 Apr, 2024 (Tomorrow)
    Posted : 12 days ago
    Started : 28 Mar, 2024 (27 days ago)

    Time is measured from when assigned to the vendor until the vendor marks “in progress” (meaning that a technician is on site) in work order system Priority 1 work orders are generally to be used for a system failure that causes multiple rooms to lose HVAC. They are also used if there is a major event in a single room that requires immediate assistance.

    From: Columbus City (School)

  • ITB #992 - HVAC EAST-CENTRAL SOUTH: General Repairs and Boiler PM

    Type : Bid Notification

    Due : 26 Apr, 2024 (Tomorrow)
    Posted : 12 days ago
    Started : 17 Mar, 2024 (1 month ago)

    Time is measured from when assigned to the vendor until the vendor marks “in progress” (meaning that a technician is on site) in work order system Priority 1 work orders are generally to be used for a system failure that causes multiple rooms to lose HVAC. They are also used if there is a major event in a single room that requires immediate assistance.

    From: Columbus City (School)