Search results for: royal poinciana

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 28
  • Replacement Parts For Repair At Royal Poinciana

    Type : Bid Notification

    Due : 20 Sep, 2023 (7 months ago)
    Posted : 7 months ago
    Started : 18 Sep, 2023 (7 months ago)

    Bid Details Planholder Replacement Parts For Repair At Royal Poinciana Active Browse Awarded Bids Download Bid Package Bid Details Agency Name Town of Palm Beach ( Part of Demandstar Extended Network ) Bid Writer Carlos E.

    From: Town of Palm Beach (Town)

  • ITB # 03-22/23 - CONSTRUCTION OF SOUTH ROYAL POINCIANA STORMWATER AND ROADWAY IMPROVEMENT PROJECT

    Type : Bid Notification

    Due : 21 Dec, 2022 (16 months ago)
    Posted : 18 months ago
    Started : 07 Dec, 2022 (16 months ago)

    ”) is soliciting bids from prequalified Florida Department of Transportation contractors for the Construction of South Royal Poinciana Stormwater and Roadway Improvement Project.

    From: Miami Springs (City)

  • Bid No.2021-15 Royal Poinciana Way Irrigation Project

    Type : Bid Notification

    Due : 27 May, 2021 (about 2 years ago)
    Posted : about 3 years ago
    Started : 27 Apr, 2021 (about 3 years ago)

    Agency NameTown of Palm Beach Bid WriterDuke Basha Bid IDITB-2021-15-0-2021/DB Bid TypeITB - Invitation to Bid Broadcast Date04/27/2021 10:46 AM Eastern Fiscal Year2021 Due Date05/27/2021 2:00 PM Eastern Bid Status TextNone FilenameTypeDate ModifiedStatus Advertisement Attachment04/27/2021Complete SpecificationsBid Document / Specifications04/27/2021Complete Bid BondYes Plan (blueprint)Agency distributing plans eBiddingNo Distributed ByAgency Distribution MethodDownload and Mail Distribution OptionsPlans are being distributed by Agency Distribution NotesNone BetaJones Group, Inc., TheMiamiFL ConstructConnectCincinnatiOH Construction Journal, Ltd.StuartFL Dodge DataArlingtonTX Landscape Service Professionals, Inc.Coral ...

    From: Town of Palm Beach (City)

  • 24-019 Central Ave Median Landscape - ITB

    Type : Bid Notification

    Due : 23 Apr, 2024 (5 days ago)
    Posted : 1 month ago
    Started : 20 Mar, 2024 (1 month ago)

    There are 2 large Royal Poinciana trees in the 300 block of the medians that remain and will be redesigned around. This project includes new ornamental shrubs, groundcovers and adds to the canopy capacity by replanting trees and palms.Show Less

    From: Naples (City)

  • RFB No. 30-2021 - Electrical System Maintenance Associated with the Annual Holiday

    RFB No. 30-2021 - Electrical System Maintenance Associated with the Annual Holiday

    Type : Contract

    Due : 30 Sep, 2026 (in about 2 years)
    Posted : 1 hour ago
    Started : 14 Apr, 2024 (15 days ago)

    The lighting electrical systems are located in the medians of Royal Palm Way and Royal Poinciana Way, and sidewalks on Worth Avenue, Palm Beach, Florida 33480.Start Date:01 Oct 2022End Date:30 Sep 2023FilesShow/Hide Download grid export Drag here to set row groupsDrag here to set column labels Name Type Date Created Action No Rows To Show Columns Name to of Page of

    From: Palm Beach (Town)

  • General Services Administration (GSA) seeks to lease the following space: RLP No. 3FL0539

    Type : Bid Notification

    Due : 02 Feb, 2024 (2 months ago)
    Posted : 3 months ago
    Started : 11 Jan, 2024 (3 months ago)

    General Services Administration (GSA) seeks to lease the following space: State: Florida City: West Palm Beach Delineated Area: North: N Quadrille Boulevard; Flagler Memorial Bridge; Royal Poinciana Way East: Ocean Boulevard; Via Del Mar; S County Road South: Southern Boulevard West: S Dixie Highway; Okeechobee Boulevard; S/N Quadrille Boulevard Minimum Sq. Ft. (ABOA): 10,877 Maximum Sq. Ft.

    From: Federal Government (Federal)

  • ITB No. 08-22/23 for Construction of the Oakwood Drive and East Drive Stormwater and Roadway Improvement Project.

    Type : Bid Notification

    Due : 14 Sep, 2023 (7 months ago)
    Posted : 8 months ago
    Started : 31 Aug, 2023 (8 months ago)

    The Project is intended to provide water quality, stormwater management, roadway and landscape improvements and beautification along the East Drive corridor from NW 36th Street on the south to South Royal Poinciana Boulevard on the north, as well as drainage improvements in Stafford Park and along Oakwood Drive (the “Project Area”).

    From: Miami Springs (City)