WIFI CABLE RUN FOR MECHANICAL ROOMS Solicitation ID/Procurement Identifier: GS02P14PCD0029 Ultimate Completion Date: Fri Oct 21 17:00:00 GMT 2022
WIFI CABLE RUN FOR MECHANICAL ROOMS Solicitation ID/Procurement Identifier: GS02P14PCD0029 Ultimate Completion Date: Fri Oct 21 17:00:00 GMT 2022
Pre-Bid Conference February 16, 2018 10:00 AM 2388 Liberty Way VB, VA 23456 (757) 385-4438 Publications The Virginian-Pilot2/4/2018 The Virginian-Pilot2/4/2018 Documents Bid PackageGREEN RUN LAKE #3 MECHANICAL DREDGING (2 Pages, Complete)AwardNOTICE OF INTENT (1 Page, Complete) Commodity Codes 022-968-34 - Dredging Services
The group specializes in single job/prototype work and short production runs of unique mechanical components. The group also provides mechanical engineering design, optics and glass fabrication, and overall technical solutions for the fabrication and assembly of electromechanical devices. To meet mission requirements, the FTO needs to procure two new multi-tasking 5-Axis Mill Turning Centers.
Install new pump & motor, re-use existing conduits, etc., run new electrical wire for motor circuit. Replace motor mechanical safety switch on newly re-wired electric circuit. Provide new flexible conduit and wire from new starter to pump motor. Remove all trash.
Prior to the mechanical aerator installation, (4) electrical services need to be installed and run out to the proposed mechanical aerator locations in addition to the installation (4) manufacturer supplied motor control boxes that will be used to control the aerators once installed. This scope of work pertains to the installation of the electrical services and the installation of the manufacturer supplied motor control boxes only.
This chiller is not equipped with a single Run Status or Alarm digital input signals. Please advise design intent for hardwired control points for the dry cooler. VA REPLY: Six (6) digital outputs staggered for control. Omit Run Status or Alarm digital input signal points. Mechanical drawing MP103-2 details eleven (11) locations to provide programming for ether an existing or newly installed energy control valve.
There is a dedicated room for laundry that is adjacent to the mechanical room. Domestic hot water is provided by an underground service loop that runs from the mechanical room parallel to the domestic cold water. Heating and cooling are also provided via tempered water from the mechanical room. The design scope is to convert units one through eight into two bedroom single family units by combining two existing units into one new unit.