Search results for: runway and aircraft

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 748
  • ITB Aircraft Runway Deicer

    Type : Bid Notification

    Due : 24 Mar, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 07 Mar, 2022 (about 2 years ago)

    ITB Aircraft Runway Deicer Closing date March 24, 2022, 01:30 PM Reference number22-0088 StatusOpen SummaryThe City of Fort Worth (City) requests bids for aircraft runway deicer on an as-needed basis for the Aviation Department. Contact details Wilkerson, Alyssa fmspurchasingresponses@fortworthtexas.gov Related Information RFP Documents

    From: Fort Worth (City)

  • RFQt Aircraft Runway Deicer

    Type : Bid Notification

    Due : 04 Feb, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 14 Jan, 2022 (about 2 years ago)

    RFQt Aircraft Runway Deicer Closing date February 04, 2022, 08:30 AM Reference number22-0057 StatusOpen SummaryThe City of Fort Worth (City) requests quotations for aircraft runway deicer from qualified bidders on an as-needed basis for the Aviation Department as specified in this Request for Quotations (RFQt).

    From: Fort Worth (City)

  • Runway and Aircraft Deicing Materials

    Type : Bid Notification

    Due : 05 Aug, 2022 (21 months ago)
    Posted : 22 months ago
    Started : 08 Jul, 2022 (22 months ago)

    LOUIS AIRPORT COUNTY OF ST. CLAIR, ILLINOIS INVITATION TO BID INVITATION FOR BIDS FOR RUNWAY AND AIRCRAFT DEICING MATERIALS SOLICITATION NO. 2022-18 Issue Date: July 8, 2022 Pre-bid Conference: None Pre-bid Question Deadline: July 29, 2022 at 2:00 PM Local Time Bid Deadline: August 5, 2022 at 2:30 PM Local Time MidAmerica St. Louis Airport Department of Engineering and Planning 9768 Airport Blvd.

    From: MidAmerica St Louis Airport (Airport)

  • Aircraft Runway Rubber Removal & Painting

    Type : Bid Notification

    Due : 02 Dec, 2019 (about 4 years ago)
    Posted : about 4 years ago
    Started : 31 Oct, 2019 (about 4 years ago)

    Naval Air Station (NAS) Key West has an active airfield consisting of six (6) runways and associated taxi and aircraft parking apron facilities on Boca Chica Key. This Firm Fixed Price (FFP), Requirements contract will require the removal of air craft tire rubber and paint from various airfield locations, and the painting of existing/new markings that are compliant with most current version of FAA and Naval regulations.

    From: Federal Government (Federal)

  • Tuscaloosa National Airport - Taxiway A Crack Seal and Taxiway B Crack Seal and Seal Coat

    Type : Bid Notification

    Due : 22 May, 2024 (in 19 days)
    Posted : 23 hours ago
    Started : 26 Apr, 2024 (5 days ago)

    To enable the safe completion of these work items, while the airport’s Runway 12-30 remains open to air traffic, access to the active Runway 12-30 will be maintained throughout construction with the successful bidder’s deployment and rearrangement of low-level aircraft barricades to provide aircraft routes along portions of Taxiways A and B that avoid active work zones.

    From: Tuscaloosa (City)

  • Test Aircraft for Wet Runway Wheel Braking Testing - Request for Information (RFI)

    Type : Bid Notification

    Due : 17 Jul, 2019 (about 4 years ago)
    Posted : about 4 years ago
    Started : 03 Jul, 2019 (about 4 years ago)

    The ability of the contractor to provide one or multiple Part 25 (or size-equivalent) test aircraft with turbofan engines, a digital, full-modulating anti-skid system, and the ability to record the set of parameters required to fulfill the experiment objectives as described in the attached draft Test Plan. 2.

    From: Federal Government (Federal)

  • Repair Aircraft Systems and Restripe Runway - Homestead ARB, FL

    Type : Bid Notification

    Due : 16 Sep, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 09 Sep, 2020 (about 3 years ago)

    Projects similar in Scope to this project included: Construction experience (new or renovation) on an active airfield including aircraft arresting systems; airfield runway, taxiway, and apron paving projects; fuel hydrant distribution systems; or other major airfield systems.b. Based on definitions above, for each project submitted include:i. Current percentage of construction complete and the date when it was or will be completed.ii.

    From: Federal Government (Federal)