Type : Bid Notification
and Driveway, Including Pedestrian and Handicap Ramps [022-913-57] Construction, Vaulted Sidewalk [022-913-82] Maintenance and Repair, Sidewalk and Driveway, Including Removal
and Driveway, Including Pedestrian and Handicap Ramps [022-913-57] Construction, Vaulted Sidewalk [022-913-82] Maintenance and Repair, Sidewalk and Driveway, Including Removal
New Sidewalk & Replacement of existing sidewalksNew InterlockNew parking lane on BroadwayAll tender items as per Ontario Provincial Standards Bid Document Access : - Bid document preview, bid opportunity, and award notices are available on the site free of charge. Suppliers are not required to register for a bid opportunity prior to previewing unsecured bid documents.
a qualified contractor capable of constructing a 6-foot wide ADA compliant concrete sidewalk, re-stripe selected parking stalls, and provide a required ADA signage at Ralph Russell Park ......
South of Hogan Park on the east side of Russell Rd, the drainage ditch will be filled to construct a 650; long shared use path/sidewalk connecting Hogan Park to Meeker St. This segment of the sidewalk will include pedestrian scale lighting and street trees. Speed cushions will be installed on Russell Rd and 240th St. The Hogan Park parking lot will be overlayed with 2” of HMA.
Pre-Bid Conference Publications Ocala Star Banner10/27/2017Ocala Star Banner11/3/2017 DocumentsBid Package18B-041 Ralph Russell Park Parking Lot and Sidewalk Improvements (27 Pages, Complete) 18B-041 Addendum 1 Ralph Russell Park Parking Lot and Sidewalk Improvements (1 Page, Complete) 18B-041 PREBID Agenda and Sign In Sheet (2 Pages, Complete) 18B-041 Addendum 2 (2 Pages, Complete) 18B-041 ADDENDUM 3 Ralph Russell Park Parking Lot and Sidewalk
South of Hogan Park on the east side of Russell Rd. the drainage ditch will be filled to construct a 650’ long shared use path/sidewalk connecting Hogan Park to Meeker St. This segment of the sidewalk will include pedestrian scale lighting and street trees. Speed cushions will be installed on Russell Rd. and 240th St. The Hogan Park parking lot will be overlayed with 2” of HMA.
South of Hogan Park on the east side of Russell Rd. the drainage ditch will be filled to construct a 650’ long shared use path/sidewalk connecting Hogan Park to Meeker St. This segment of the sidewalk will include pedestrian scale lighting and street trees. Speed cushions will be installed on Russell Rd. and 240th St. The Hogan Park parking lot will be overlayed with 2” of HMA.