Type : Bid Notification
YesIt is assumed a detailed evaluation of the sequence of operation for the existing fire alarm/mass notification system is not required for this survey documentation. Only installation deficiencies reported or observed are required to be evaluated. Noted. Is this correct?Yes.The General Requirements section of the Safety Survey SOW includes responsibilities associated with construction activities.