Search results for: sahara avenue

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 37
  • Sahara Avenue - Hollywood Boulevard to Los Feliz Street

    Type : Bid Notification

    Due : 14 Dec, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 16 Nov, 2020 (about 3 years ago)

    The work to be performed under this contract is widening the north side of Sahara Avenue from Hollywood Boulevard to Los Feliz Street. The improvement includes pavement, type II aggregate, sidewalk, curb & gutter, cutoff wall, pavement markings, street lights, conduit, pull box adjustment , permanent signs, water line connection for future service and other associated improvement.

    From: Southern Nevada Regional Housing Authority (State)

  • Interstate 15 Feasibility Study Sahara Avenue to the Flamingo Road Interchange

    Type : Bid Notification

    Due : 11 Oct, 2018 (about 5 years ago)
    Posted : about 5 years ago
    Started : 10 Sep, 2018 (about 5 years ago)

    the Flamingo Road InterchangeBackGround:The purpose of this procurement is to produce a feasibility study for the I-15 from the Sahara Avenue Interchange to the Flamingo Road Interchange where Valley View Boulevard is the western limit and Las Vegas Boulevard is the eastern limit.

    From: Nevada Department of Transportation (Transportation)

  • DECATUR BOULEVARD, TROPICANA AVENUE TO SAHARA AVENUE

    Type : Bid Notification

    Due : 13 Dec, 2022 (16 months ago)
    Posted : 16 months ago
    Started : 03 Nov, 2022 (17 months ago)

    This project consists of roadway removal and reconstruction improvements on Decatur Boulevard, from Tropicana Avenue to Sahara Avenue, and intersecting side streets.

    From: Southern Nevada Regional Housing Authority (State)

  • SAMMY DAVIS JR. DRIVE, FRANK SINATRA DRIVE TO SAHARA AVENUE

    Type : Bid Notification

    Due : 09 May, 2022 (23 months ago)
    Posted : about 2 years ago
    Started : 07 Apr, 2022 (about 2 years ago)

    Drive to Sahara Avenue. Improvements for South Bridge Lane consist of, full depth roadway reconstruction, and mill and overlay of existing pavement within the existing right-of-way, widening the curb return at Sahara Avenue to accommodate the off tracking of truck trailers, minor storm drain system, and pavement markings. BID OPENING WEBEX DETAILS Meeting Link:

    From: Southern Nevada Regional Housing Authority (State)

  • SAMMY DAVIS JR. DRIVE, FRANK SINATRA DRIVE TO SAHARA AVENUE

    Type : Bid Notification

    Due : 12 May, 2022 (23 months ago)
    Posted : about 2 years ago
    Started : 07 Apr, 2022 (about 2 years ago)

    Drive to Sahara Avenue. Improvements for South Bridge Lane consist of, full depth roadway reconstruction, and mill and overlay of existing pavement within the existing right-of-way, widening the curb return at Sahara Avenue to accommodate the off tracking of truck trailers, minor storm drain system, and pavement markings. BID OPENING WEBEX DETAILS Meeting Link:

    From: Southern Nevada Regional Housing Authority (State)

  • Request for Statement of Qualifications (RSOQ) Sahara Avenue / Las Vegas Boulevard South Pedestrian Bridge

    Type : Bid Notification

    Due : 26 Feb, 2019 (about 5 years ago)
    Posted : about 5 years ago
    Started : 29 Jan, 2019 (about 5 years ago)

    None

    From: Las Vegas (City)

  • CLARK COUNTY (CC

    Type : Bid Notification

    Due : 16 Oct, 2019 (about 4 years ago)
    Posted : about 4 years ago
    Started : 18 Sep, 2019 (about 4 years ago)

    The Maryland Parkway Corridor study area extends 3.8 miles from Sahara Avenue south to Russell Road. Investments in multimodal transportation infrastructure could improve mobility along the corridor for motorists, transit riders, bicyclists and pedestrians that will enhance access to the surrounding areas.

    From: Southern Nevada Regional Housing Authority (State)