Type : Bid Notification
Summary DetailsThe Contractor will perform the CMI and YSM ground sampling data collection for 19 samples in Robson Valley TSA according to the standards, procedures, and requirements outlined in this document.
Summary DetailsThe Contractor will perform the CMI and YSM ground sampling data collection for 19 samples in Robson Valley TSA according to the standards, procedures, and requirements outlined in this document.
NOTICE OF CONTRACT 2ND EXTENSION MASTER AGREEMENT ANNUAL REQUIREMENTS CONTRACT: ASBESTOS MONITORING & SAMPLING COMMODITY CODE: 92658 CONTRACT #: AM120621 INITIATING DEPT: DPW 1494 OPENING DATE: 10-27-2021 PERIOD OF CONTRACT: 12-06-2023 THROUGH 12-05-2024 BID #: 21/0360LWI VENDOR: TECTONIC ENGINEERING & SURVEYING CONSULTANTS, P.C. 70 PLEASANT HILL RD PO BOX 37 MOUNTAINVILLE NY 10953 VENDOR ID: VC0031917 CONTACT: LORI BART PHONE: 845-534-5959 FAX: 845
Albert (the “City”) to prospective proponents to submit proposals for Annual Groundwater Monitoring and Sampling Program Consultant, as further described in Section A of the RFP Particulars (Appendix B) (the “Deliverables”). The consultant will be required to conduct annual groundwater monitoring activities, as outlined the corresponding Risk Management Plans and 2023 consultant recommendations (See Appendix B – RFP Particulars B.
Examples should demonstrate monitoring, sampling and analysis aspects, and make it clear how these tasks were accomplished.Only firm fixed price offers will be evaluated.
Can you please clarify the need for Provide services of a Certified Air Sampling Technician during the asbestos air quality monitoring and sampling activities as a stand-alone bid item? SOW B.3.1.4 Air Monitoring (E) states Contractor shall continuously inspect and monitor conditions inside the work areas to ensure compliance with all regulations .
IDC FOR ASBESTOS AIR MONITORING AND MATERIAL SAMPLING SERVICES Solicitation ID/Procurement Identifier: 36C24224Q0327 Ultimate Completion Date: Mon Apr 30 17:00:00 GMT 2029
The State is seeking proposals from qualified organizations to provide Water Quality Sampling and Monitoring services beginning August of 2021 Firms may propose for all or a portion of the required Areas of Expertise. No Pre-Offer Conference will be held. Do not Use the "Download with Excel" button for the Required Forms located on the Technical Questions and Financial Questions Tabs. Download each Word document separately.