New manholes have been installed on the other side of the road and will be labeled MH X1, MH X2, and MH X3. Manhole X2 has conduit to feed B15. At MH X3 a new conduit will need to be installed across the road to MH 3AA. This will require two 4-inch conduits (new feeder and space) encased in concrete. Saw cut exiting road, provide conduits incased in concrete, provide fill as needed, and repair existing concrete road with new concrete.