Type : Bid Notification
server-based Geo SCADA system and all the necessary programming for the new programmable logic controller to modernize the NWEC control systems.
server-based Geo SCADA system and all the necessary programming for the new programmable logic controller to modernize the NWEC control systems.
The 9 reservoir locations include tank level and battery level indications on 5 solar powered sites, and level, power failure, other status and control indications on some of the other 4 sites. The pump station sites each contain 2 electric pumps, power failure, flow meter, pressure sensors, and 2 have pump control valves.
Key Contractor Responsibilities Pursuant to the Construction Contract, the Contractor will be responsible for: (a) replacement of UV disinfection equipment and associated components as will be provided under the UV Equipment Supply Contract; (b) supply and installation of new control panels, PLC and HMI hardware and software; (c) design and prepare new control panel drawings for existing PLC control panels and new control panels identified in the
2615 hungv@ci.clovis.ca.us Bids to Submit questions online through the PlanetBids Vendor Portal Owner's Agent Description Scope of Services The City of Clovis, through its Public Utilities Department, is soliciting proposals from qualified software manufacturers or their certified sales representatives to provide new Human Machine Interface (HMI) software to upgrade the City’s Supervisory Control
Use the solicitation number as the SUBJECT: W911WN23Q3014 SCADA Control Systems. An amendment to the solicitation will be posted on SAM to answer all questions received in a timely manner.
Lakes of Forest Pine Lift Station: The replacement of lift station control panel with SCADA capabilities, terminal boxes, safety grating, wet well vent flange and screen; the installation bypass pump and self-supporting antenna tower; blast and recoat aboveground piping and generator enclosure. - Contact Info Contact: Michael Mawdsley Phone: 713-777-5337 Fax: Email: mmawdsley@quiddity.com
Switch; removal of existing control panel; installation of new control panel with PLC and HMI, electrical work including controls, conduit and wire; and all else shown on the contract drawings Water Plant No. 1: Construction of District SCADA System includes, but is not limited to, installation of a firewall switch in the existing Auto Sensory panel; electrical work including controls, conduit and wire; and all else shown on the contract drawings