Type : Bid Notification
High level deliverables include a fully installed Battery Energy Storage System (BESS) and Battery Management System (BMS) integrated into the grid and a local PV array. Broadcast Date 1/6/2022 7:00 PM Question End Date 1/18/2022 5:00 PM Due Date 2/17/2022 2:00 PM Opening Date 2/10/2022 2:30 PM Anticipated Award Date