Search results for: school boiler and pump

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 129
  •  Freedom High School Boiler & Pump Replacement 

    Type : Bid Notification

    Due : 31 Jan, 2024 (3 months ago)
    Posted : 3 months ago
    Started : 21 Dec, 2023 (4 months ago)

    ADVERTISEMENT FOR BIDS 001113 - 1 SECTION 001113 – ADVERTISEMENT FOR BIDS The Bethlehem Area School District is soliciting SEPARATE sealed bids for the following individual Projects in the form of SINGLE prime lump sum contracts.  Freedom High School Boiler & Pump Replacement  Liberty High School Klein Center Boiler & Pump Replacement Bids shall be delivered to Mark Stein, Chief Facilities and Operations Officer, Bethlehem Area School District Education

    From: Bethlehem Area School District (School)

  • KC Fire School - Boiler and Pump Replacement

    Type : Bid Notification

    Due : 11 Oct, 2022 (18 months ago)
    Posted : 20 months ago
    Started : 02 Sep, 2022 (20 months ago)

    Bid Status Details for KC Fire School - Boiler and Pump Replacement OMB-MC1002000585 Solicitation Ad Date 9/2/2022 Deadline for Bid Responses 10/11/2022 at 02:00 PM Local Time Contact Information jim.fox@delaware.gov Supporting Bid Documents RFP - Public Works Specifications Wage Rates Drawings Back To Bids

    From: Delaware (State)

  • Berlin Public Schools - High School Boiler Replacement

    Type : Bid Notification

    Due : 01 Dec, 2023 (5 months ago)
    Posted : 4 months ago
    Started : 09 Nov, 2023 (5 months ago)

    Bid Information Bid Alert No: 00003792565 Bid Title: Berlin Public Schools - High School Boiler Replacement Agency Bid No. Title: 2023-17 Received Date: 11/09/2023 Close Date: 12/01/2023 Purchase Type: Not Stated Delivery Point: Berlin, New Hampshire Delivery Date: Not Stated Special Notices: Site-Walk Mandatory 11/16/2023 10:30 AM, Questions Due By 11/21/2023 12:00 PM Specifications Specifications include, but are not limited to: A.

    From: New Hampshire (State)

  • Myers Middle School Boiler and Pumps Replacement

    From: Savannah-Chatham County School System (School)

  • Furnishing of labor, material, and equipment for the Southwest Elementary School Boiler Replacement

    Type : Bid Notification

    Due : 12 Jul, 2022 (21 months ago)
    Posted : 22 months ago
    Started : 28 Jun, 2022 (22 months ago)

    CONDENSING BOILER CONTROL - PRIMARY SECONDARY PUMPING LEAD / LAG BOILER AND PRIMARY PUMP CONTROL: DDC SYSTEM SHALL SEND AN ENABLE SIGNAL TO THE BOILER CONTROL SYSTEM TO START AND STOP THE BOILERS WITH LEAD / LAG CONTROL.

    From: Durham Public Schools (School)

  • Furnishing of labor, material, and equipment for the Southwest Elementary School Boiler Replacement

    Type : Bid Notification

    Due : 12 Jul, 2022 (21 months ago)
    Posted : 22 months ago
    Started : 28 Jun, 2022 (22 months ago)

    CONDENSING BOILER CONTROL - PRIMARY SECONDARY PUMPING LEAD / LAG BOILER AND PRIMARY PUMP CONTROL: DDC SYSTEM SHALL SEND AN ENABLE SIGNAL TO THE BOILER CONTROL SYSTEM TO START AND STOP THE BOILERS WITH LEAD / LAG CONTROL.

    From: Pender County Board Of Education (School)

  • for furnishing of labor, material, and equipment for the DPS Project No. 306-05, Brogden Middle School - Boiler Replacement, 1001 Leon Street, Dur...

    Type : Bid Notification

    Due : 19 May, 2022 (23 months ago)
    Posted : about 2 years ago
    Started : 02 May, 2022 (about 2 years ago)

    Project scope: Remove two existing boilers, two boiler pumps, boiler vent pipes, and associated accessories. Remove domestic water heater vent pipe. Provide and install two new gas-fired condensing boilers, two boiler pumps, and associated piping, vents, insulation, and accessories. Provide new vent pipe for the existing gas-fired domestic water heater. Make safe and disconnect associated mechanical equipment circuits. Remove boiler circuits.

    From: Durham Public Schools (School)