Type : Bid Notification
Matrix.xlsx Table D-1: Project Cost Table and Staffing Matrix23 KB 21-0328.00 East Bank Compressed Air Infrastructure Study FINAL.pdf East Bank Compressed Air System Infrastructure Study3.22 MB
Matrix.xlsx Table D-1: Project Cost Table and Staffing Matrix23 KB 21-0328.00 East Bank Compressed Air Infrastructure Study FINAL.pdf East Bank Compressed Air System Infrastructure Study3.22 MB
Matrix.xlsx Table D-1: Project Cost Table and Staffing Matrix23 KB 21-0328.00 East Bank Compressed Air Infrastructure Study FINAL.pdf East Bank Compressed Air System Infrastructure Study3.22 MB
Matrix.xlsx Table D-1: Project Cost Table and Staffing Matrix23 KB 21-0328.00 East Bank Compressed Air Infrastructure Study FINAL.pdf East Bank Compressed Air System Infrastructure Study3.22 MB Addendum1.zip Addendum # 1 Documents5.98 MB
AIR COMPRESSOR PM Solicitation ID/Procurement Identifier: 36C26220Q1069 Ultimate Completion Date: Thu Jul 31 17:00:00 GMT 2025
Preventative Maint and Repair Compressed Breathing Air System 14-21ksc Stallion Air Inc. 11/30/2024 1.0 SB
***Update 12 August 2023*** - Amendment 0001 posted to Combo with pictures of existing system. This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued.W50S8V-23-Q-0024 – This solicitation is issued as a request for quotation (RFQ).This solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2023-04; dated 2 June 2023.This requirement is designated with a Small Business set-aside of Total Small Business and associated wi...