Type : Bid Notification
Due : 02 May, 2024 (in 7 days)
Posted : 29 days ago
Started : 25 Mar, 2024 (1 month ago)
The essential portions of the proposed work are summarized as follows: bridge replacement (FSB superstructure with steel pipe piles), seawall replacement, roadway reconstruction, sidewalk reconstruction, utility relocation, and harmonization of the project to the surrounding properties.BackgroundThe Venetian Boulevard NE Bridge (Bridge No. 157186) was constructed in 1957 and services Venetian Boulevard NE over the Venetian Canal in St.