  • Riverbrook Drive Culvert Replacement

    Type : Bid Notification

    Due : 16 May, 2024 (in 14 days)
    Posted : 29 days ago
    Started : 02 Apr, 2024 (29 days ago)

    Work includes replacement of existing pipe arch with 17'-0" x 10'-10" x 58'-6" long aluminum structural plate pipe arch embedded to incorporate a natural stream bottom, reconstruction of stream channel, stream banks, and roadway approaches; installation of one-way temporary bypass road including temporary stream crossing structure, and all associated erosion prevention and sediment control work.

    From: Vermont (State)

  • Grays Creek <b>Water</b> Extension Design RFQ

    Grays Creek Water Extension Design RFQ

    Type : Bid Notification

    Due : 02 May, 2024 (Today)
    Posted : 8 days ago
    Started : 09 Apr, 2024 (23 days ago)

    Design of erosion and sediment control measures required. F. Design traffic control plans as necessary. G. Perform environmental assessments as necessary. H. Complete all necessary permit applications, including wetlands. I. Attend any scheduled public meetings. J. Consult with PWC, City Departments, other utilities, NCDOT, to coordinate on-going improvements. Drafting A.

    From: Fayettevilles Hometown Utility (Utilities)

  • <b>EROSION</b> & <b>SEDIMENT</b> <b>CONTROL</b> (ERS-20241) - SANTA FE

    EROSION & SEDIMENT CONTROL (ERS-20241) - SANTA FE

    Type : Contract

    Due : 29 Mar, 2024 (1 month ago)
    Posted : 1 month ago
    Started : 20 Mar, 2024 (1 month ago)

    EROSION & SEDIMENT CONTROL (ERS-20241) - SANTA FE Solicitation ID/Procurement Identifier: 140S0124P0002 Ultimate Completion Date: Fri Mar 29 17:00:00 GMT 2024

    From: Federal Procurement Data System (Federal)

  • Abandoned Mine Reclamation Project, West Liberty South #1, Brady Township, Butler

    Type : Bid Notification

    Due : 09 May, 2024 (in 7 days)
    Posted : 19 days ago
    Started : 28 Mar, 2024 (1 month ago)

    OSM 10(6495)101.1 Abandoned Mine Reclamation Project, West Liberty South #1, Brady Township, Butler County Estimated Amount: $500,000 to $1,000,000 Term: 360 calendar days Bid Bond Required Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 2 Each Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 672

    From: Pennsylvania Department of Environmental Protection (State)

  • Upper Highlands Culvert Rehabilitation

    Type : Bid Notification

    Due : 07 May, 2024 (in 5 days)
    Posted : 1 month ago
    Started : 12 Mar, 2024 (1 month ago)

    , retaining walls, and vegetation;Install and maintain creek bypass and erosion and sediment control measures;Removal and disposal, protection, and/or installation of culvert headwall(s);Removal and disposal of existing concrete and wood stave culvert(s);Supply and install 22m of 1050mm concrete culvert pipe via open cut;Installation of lock block headwall; andInstallation of cast in place culvert inlet manhole structure incl. plastic manhole pipe

    From: North Vancouver (Other)

  • Lake Purdy Dam Stability Improvements Project

    Lake Purdy Dam Stability Improvements Project

    Type : Bid Notification

    Due : 02 May, 2024 (Today)
    Posted : 2 months ago
    Started : 15 Feb, 2024 (2 months ago)

    Providing and maintaining erosion and sediment control measures, and obtaining stormwater NPDES Permit. d. Construction of a sedimentation pond and outfall structure. e. Extending and encasing the existing low-level outlet pipes. f. Providing reinforced concrete for pipe encasement, stilling basin, training walls, retaining walls, spillway control section, and raising the dam crest. g.

    From: Birmingham Water Work (City)

  • Sewer Extension Airport Hanger & Gowen Road - Phase 1 (CSP 1188)

    Type : Bid Notification

    Due : 08 May, 2024 (in 6 days)
    Posted : 7 days ago
    Started : 23 Apr, 2024 (8 days ago)

    Surface Restoration (Landscaping) 50 LF - Linear Foot P3 308.4.1.A.1 Steel Casing Pipe Boring and Jacking, 125 LF - Linear Foot 24" (Diameter) P4 1001.4.1.A.1 Sediment Control 1 LS - Lump Sum P5 1103.4.1.A.1 Construction Traffic Control 1 LS - Lump Sum P6 2010.4.1.A.1 Mobilization 1 LS - Lump Sum P7 2010.4.1.B.1 Sanitary Facilities 1 LS - Lump Sum 24 April 202424 April 202424 April 202424 April 2024 Service Line Items Service Line Items There are

    From: Boise (City)