Search results for: sewer cipp lining

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 23
  • CIPP UV Lining Rehabilitation of Sewers Phase 1 - 2024

    Type : Bid Notification

    Due : 09 May, 2024 (in 7 days)
    Posted : 26 days ago
    Started : 22 Mar, 2024 (1 month ago)

    9487 - CIPP UV Lining Rehabilitation of Sewers Phase 1 - 2024 The work includes the trenchless rehabilitation of approximately 14,973 linear feet of sanitary sewer pipelines ranging in size from 8” to 15” diameter using an Ultraviolet light cure CIPP system.

    From: Madison (City)

  • Sanitary Sewer CIPP Lining Project

    Type : Bid Notification

    Due : 25 Apr, 2024 (6 days ago)
    Posted : 1 month ago
    Started : 19 Mar, 2024 (1 month ago)

    Bid Title:Sanitary Sewer CIPP Lining Project Category:City of Pella BidsStatus:OpenBid Recipient:City of Pella City Clerk Description: See attached Notice to Bidders Publication Date/Time: 3/19/2024 6:20 PM Publication Information: See attached Notice to Bidders Closing Date/Time: 4/25/2024 11:00 AM Submittal Information: City of Pella City Clerk 825 Broadway Street Pella, IA 50219 Related Documents: Notice to Bidders Sanitary Sewer CIPP Lining (PDF

    From: Pella (City)

  • IFB 24-002 ESH Storm & Sewer Replacement

    Type : Bid Notification

    Due : 22 May, 2024 (in 20 days)
    Posted : 10 days ago
    Started : 19 Apr, 2024 (12 days ago)

    Summary: The project is generally described as the replacement of approximately 580 linear feet of 6-inch PVC sewer line, 50 linear feet of 15-inch RCP storm line, and 60 linear feet of 24-inch RCP storm line, cleaning and CIPP lining of 1510 linear feet of existing storm and sanitary pipe, and cleaning of 990 linear feet of storm pipe. The project will also replace 2 headwall structures and rehabilitate existing storm and sewer infrastructure.

    From: Virginia (State)

  • Large Diameter Combined Sewer Rehabilitation

    Type : Bid Notification

    Due : 07 May, 2024 (in 5 days)
    Posted : 1 month ago
    Started : 26 Feb, 2024 (2 months ago)

    The improvements include rehabilitation of existing 90”, 96”, 108” combination sewer by spray-on geopolymer method, the CIPP lining an existing 30” diameter RCP pipe, bypass pumping, sewer cleaning and televising, manhole lining, lateral service connections, sewer cleanouts, sewer point repairs, and traffic control protection.

    From: Christopher B Burke Engineering (Co-op)

  • CURED-IN-PLACE PIPE LINING (222253-002)

    Type : Bid Notification

    Due : 31 Mar, 2025 (in 11 months)
    Posted : 12 days ago
    Started : 04 Apr, 2024 (27 days ago)

    This Bid Item is for work requested on sewers not to be lined or as a means for payment for sewers determined to not be suitable for lining upon initial investigation by Contractor and subsequently removed from the lining list.

    From: Erie (County)

  • CTH L Rehabilitation - Kenosha County

    Type : Bid Notification

    Due : 08 May, 2024 (in 6 days)
    Posted : 6 days ago
    Started : 10 Apr, 2024 (21 days ago)

    . - Varied Size Culvert CIPP Lining \ 40 L.F. - 34"x53” R.C.P.

    From: Salem Lakes (Village)

  • CURED-IN-PLACE PIPE LINING (BACK-UP) (222253-002)

    Type : Bid Notification

    Due : 31 Mar, 2025 (in 11 months)
    Posted : 12 days ago
    Started : 04 Apr, 2024 (27 days ago)

    This Bid Item is for work requested on sewers not to be lined or as a means for payment for sewers determined to not be suitable for lining upon initial investigation by Contractor and subsequently removed from the lining list.

    From: Erie (County)