Search results for: sewer operations cctv review

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 41
  • Sanitary Sewer Operations CCTV Review Support Software

    Type : Bid Notification

    Due : 14 Oct, 2022 (18 months ago)
    Posted : 19 months ago
    Started : 21 Sep, 2022 (19 months ago)

    Operation CCTV Review Support.pdf (please login to view this document) 22-22096 Sanitary Sewer Operation CCTV Review Support293 KB 22-22096 RFP Respondent Questionnaire.docx (please login to view this document) 22-22096 RFP Respondent Questionnaire53 KB 22-22096 Security_Procedures.pdf (please login to view this document) 22-22096 Security_Procedures29 KB 22-22096 Policies_on_E_E_O_and_GFEP.pdf (please login to view this document) 22-22096 Policies_on_E_E_O_and_GFEP110

    From: San Antonio Water System (Utilities)

  • Sanitary Sewer Operations CCTV Review Support Software

    Type : Bid Notification

    Due : 12 Oct, 2022 (18 months ago)
    Posted : 19 months ago
    Started : 21 Sep, 2022 (19 months ago)

    SCOPE: The San Antonio Water System (SAWS) is seeking services that provides assessment support of closed-circuit television (CCTV) on sewer main assets, builds a risk matrix using artificial intelligence and provides a summary of findings. We highly recommend online submission. This expedites the process and reduces errors for both buyer and supplier.

    From: San Antonio Water System (Utilities)

  • South Sewer Interceptor - EID - Review Only

    Type : Bid Notification

    Due : 21 Apr, 2021 (about 3 years ago)
    Posted : about 3 years ago
    Started : 25 Mar, 2021 (about 3 years ago)

    of a 10-inch sewer line (from the South Interceptor) for a distance of 943 feet that connects to the existing sewer line that extends south of Stillwater Creek....

    From: City of Stillwater (City)

  • Advertisement for Bids 2024 Cured In Place Pipe (CIPP) Installation

    Type : Bid Notification

    Due : 10 May, 2024 (in 6 days)
    Posted : 2 months ago
    Started : 23 Jan, 2024 (3 months ago)

    The successful bidder shall be responsible for bypass pumping during the installation and Quality Assurance Testing period to ensure continuous operation of the sanitary sewer system, to ensure wastewater flow at all times. All Bypass Pumping costs are to be included in their entirety as part of the submitted bid. v.

    From: Hardin County Water District (County)

  • SEWER LINING-PARK RIDGE

    Type : Bid Notification

    Due : 01 Feb, 2024 (3 months ago)
    Posted : 3 months ago
    Started : 10 Jan, 2024 (3 months ago)

    The proposed sewer main pipe locations and conditions have been determined from the available records. It is the Contractor's responsibility to review the available records, obtain additional new video records for evaluation of existing sewer system condition, field verify locations, elevations and diameters of all to be lined sewer pipes prior to ordering the appropriate materials. 2.

    From: Park Ridge (City)

  • BID PW-24-04 SEWER LINING-PARK RIDGE

    Type : Bid Notification

    Due : 01 Feb, 2024 (3 months ago)
    Posted : 3 months ago
    Started : 10 Jan, 2024 (3 months ago)

    The proposed sewer main pipe locations and conditions have been determined from the available records. It is the Contractor's responsibility to review the available records, obtain additional new video records for evaluation of existing sewer system condition, field verify locations, elevations and diameters of all to be lined sewer pipes prior to ordering the appropriate materials. 2.

    From: Park Ridge (City)

  • Design Services Effluent Tank, Pipeline, and SR89 Improvements

    Type : Bid Notification

    Due : 16 Apr, 2024 (17 days ago)
    Posted : 1 month ago
    Started : 14 Mar, 2024 (1 month ago)

    PRIMARY TECHNICAL / ADMINISTRATIVE ISSUES Existing Utilities: • Gravity Sewer Main • Effluent Main • Water Main Utility Relocation Issues: • Gravity sewer bypass pumping • Effluent bypass pumping • Interconnecting the new centralization gravity sewer main with the existing gravity sewer main with minimal impact on operations • Assessing the existing effluent force main condition to determine whether to replace the existing effluent force main in its

    From: Prescott (City)