Search results for: shadow lane campus

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 20
  • UNLV Shadow Lane Campus (SLC-A

    Type : Bid Notification

    Due : 15 Mar, 2023 (13 months ago)
    Posted : 13 months ago
    Started : 15 Feb, 2023 (14 months ago)

    UNLV has a requirement for (Shadow Lane Campus Building A west lower roof area Reroof Project) A site-visit will be held at ( Shadow Lane Campus) meet at the loading dock between Bldgs. A&B (Wednesday February 22, 2023 at 10:00am (PST)). Please sign-in upon arrival. Solicitation documents are available at NGEM “Solicitation Attachment” tab. Interested suppliers must register with NGEM to download the solicitation attachments.

    From: Southern Nevada Regional Housing Authority (State)

  • Shadow Lane Campus - North Parking Lot Realignment

    Type : Bid Notification

    Due : 01 Dec, 2022 (17 months ago)
    Posted : 17 months ago
    Started : 31 Oct, 2022 (18 months ago)

    A MANDATORY Site Visit will be held on Monday, November 07, 2022 at 10:00 AM (PST) at the following location, 1001 Shadow Lane, (LV Medical District) Las Vegas, NV 89106. (See Attachment Map in NGEM for Directions.) Meet representatives from UNLV Planning & Construction (P&C) to sign-in for the Mandatory Site Visit. Demolition of concrete, landscape and asphalt.

    From: Southern Nevada Regional Housing Authority (State)

  • Elevator Modernization Project (Phase I

    Type : Bid Notification

    Due : 19 Nov, 2019 (about 4 years ago)
    Posted : about 4 years ago
    Started : 22 Oct, 2019 (about 4 years ago)

    Meet at the north loading area of Shadow Lane Campus, Building B. Bidders bidding on Lots 1 and/or 2 MUST attend the Main Campus Pre-Bid Conference and Site Walk. Bidders bidding on Lot 3 MUST attend the Shadow Lane Campus Pre-Bid Conference and Site Walk. For clarification, Bidders bidding on Lots 1 and/or 2, and Lot 3, must attend both Pre-Bid Conferences and Site Walks.

    From: Southern Nevada Regional Housing Authority (State)

  • Dental Simulation Clinic Upgrades

    Type : Bid Notification

    Due : 27 Oct, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 06 Oct, 2021 (about 2 years ago)

    A site-visit will be held at the Shadow Lane Campus-A (SLC-A) on October 13, 2021 at 9:00am (PST) Please sign-in upon arrival. Solicitation documents are available at NGEM “Solicitation Attachment” tab. Interested suppliers must register with NGEM to download the solicitation attachments. We will NOT be holding a public bid opening at the Campus Services Building. Please submit your bids through NGEM as you normally would by the deadline.

    From: Southern Nevada Regional Housing Authority (State)

  • Strategic Infrastructure Plan

    Type : Bid Notification

    Due : 18 Jan, 2023 (15 months ago)
    Posted : 16 months ago
    Started : 30 Nov, 2022 (17 months ago)

    12/13/2022 Addendum 1 added UNLV is seeking proposals from Firms who can develop a comprehensive strategic infrastructure plan for UNLV's Maryland Campus and Shadow Lane Campuses. A Non-Mandatory virtual pre-proposal meeting will be held Friday, December 9, 2022 at 9:00am (PST) Log on: https://unlv.webex.com/unlv/j.php?

    From: Southern Nevada Regional Housing Authority (State)

  • College Boulevard Extension

    Type : Bid Notification

    Due : 16 May, 2024 (in 17 days)
    Posted : 2 days ago
    Started : 25 Apr, 2024 (3 days ago)

    Construction includes curb and gutter, sidewalk, asphalt paving, roadway matching the existing HP Way roadway section, including lanes, on-street parking, crosswalks, bike lanes, landscaping, lighting, storm drain, and utility infrastructure.

    From: City of Rio Rancho (City)

  • Shadow Ln, Campus Circle Dr, Wingren Dr, Old Singleton Rd, Rochelle Rd, and Esters Blvd Drainage Improvements

    Type : Bid Notification

    Due : 10 Jun, 2022 (22 months ago)
    Posted : 23 months ago
    Started : 16 May, 2022 (23 months ago)

    The project consists of construction of a new storm drain on Shadow Lane, construction of a concrete drainage flume on Campus Circle Drive, construction of a subdrain on Wingren Drive, remove and replace existing low water crossing culvert on Old Singleton Road, remove and replace residential driveway approach and driveway on W Rochelle Road, and storm drain repairs to remove blockage and sedimentation on Esters Boulevard.  

    From: Irving (City)