Search results for: shell and tube flow

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 16
  • Thrush hot water heater model: Hot Pak DSV 6-42 stile: Shell and tube flow 26gpm complete with the steam controller

    Type : Bid Notification

    Due : 29 Apr, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 19 Apr, 2022 (about 2 years ago)

    THRUSH. series “HPV” (formally DSV) HOT-PAK® SEMI-INSTANTANEOUS WATERHEATER STEAM TO WATER - VERTICAL DESIGN ELECTRONIC CONTROL PANEL W/WATLOW 3/4” OD TUBES - DOUBLE WALL CONSTRUCTION model HPV-S06-048 withWARREN 2” VALVE AND WATLOW CONTROLLER. 15 psi steam we need it to deliver 26gpm of hot water at 144 deg.Must be this make and model to insure fit and function of the unit with the existing equipment

    From: Federal Government (Federal)

  • Horizontal Four-Tube Low-Pressure Chemical Vapor Deposition System

    Type : Bid Notification

    Due : 28 May, 2022 (23 months ago)
    Posted : 23 months ago
    Started : 20 May, 2022 (23 months ago)

    Interlocks shall include but not be limited to:Heater cabinet over‐temperature.Lockout gas flow of hazardous gases while tube is open.Process gasses such as silane, oxygen, TEOS, dichlorosilane and ammonia shall not flow without being under vacuum.The horizontal four‐tube low‐pressure chemical vapor deposition system shall have an uninterruptable power supply for the system controls.The horizontal four‐tube low‐pressure chemical vapor deposition system

    From: Federal Government (Federal)

  • RFQ - Heat Exchanger

    Type : Bid Notification

    Due : 07 Dec, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 22 Oct, 2020 (about 3 years ago)

    . _____ The Demonstration unit must have the ability to measure thermal- hydraulic performance of at least three of the following types of heat exchangers: _____ Concentric tube _____ Shell and tube _____ Plate _____ Cross flow (using air on the gas-side) _____ Capable to select various heat exchangers by valving, or by straightforward insertion of modular devices into the demonstration unit. _____ In this instance the latter case must possess quick

    From: Tennessee Tech University (Higher Education)

  • Bid - Various Infrastructure Supplies

    Type : Bid Notification

    Due : 08 Sep, 2022 (19 months ago)
    Posted : about 2 years ago
    Started : 15 Aug, 2021 (about 2 years ago)

    The encased measuring device shall be comprised of a polyphenylene sulfide alloy flow tube with externally-threaded spud ends. Embedded in the flow tube shall be magnetic flow sensors and a replaceable strainer screen. The register shall be all electronic, programmable, and hermetically sealed with a tempered glass cover.

    From: City of Tuscaloosa (City)

  • CWSRF Project Battery B Grit and Primary Settling Tanks – Drawings Part 3

    Type : Bid Notification

    Due : 22 Jul, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 07 Jul, 2021 (about 2 years ago)

    FIELD LOCATED TERMINAL POINT TERMINAL LOW VOLTAGE FUSE FUSIBLE TERMINAL BLOCK CIRCUIT BREAKER WITH STAB CONNECTION CONTROL POWER TRANSFORMER RECEPTACLE EXCLUSIVE OR ALTERNATOR OR AND PURGE COMPLEX LOGIC COMPUTER LOGIC SYSTEM TERMINAL OR TRANSITION POINT PARTIAL FLUME MIXER SEAL VENTURI OR INSERT FLOW TUBE IN-LINE FLOW ELEMENT (ULTRASONIC) FLOW ORIFICE TURBIDITY METER ROTOMETER TIME CLOSED CONTACT ON ENERGIZATION TIME OPENED CONTACT ON ENERGIZATION

    From: Flint (City)

  • Ice Rink Refrigeration and HVAC Maintenance Services for the Robert Crown Community Center

    Type : Bid Notification

    Due : 09 Jul, 2019 (about 4 years ago)
    Posted : about 4 years ago
    Started : 12 Jun, 2019 (about 4 years ago)

    Shell and Tube Oil Cooler: HT Industrial (Chil-Con) 4. Plate and Frame Condenser (Ammonia to Glycol): Alfa Laval, Model M10BW-FD 5. Plate and Frame Heat Exchanger (Glycol to Water): Alfa Laval, Model M15B-FG 6. Pumps: B&G 7. Cooling Tower: Evapco, Model LTSE-10112F 8. Glycol Balance Valves: B&G 9. Pump Suction Diffusers: B&G 10. Glycol Relief Valves: Watts 2.1.2 General Monthly Maintenance (Performed monthly or as noted): 1.

    From: Evanston (City)

  • DORT PUMP STATION REHABILITATION – SPECIFICATIONS – 1 & 2

    Type : Bid Notification

    Due : 10 Dec, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 25 Nov, 2020 (about 3 years ago)

    Support the tremie tube to permit free movement of the discharge. Always keep the tremie tube in the freshly deposited concrete, withdrawing it only at the completion of each pour. 4. During placing operations, keep the tremie tube full to the bottom of the hopper. When a batch is dumped into the hopper, induce the flow of concrete by raising the discharge end of the tube slightly, but not out of the concrete. B.

    From: Flint (City)