Search results for: site c power pole

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 250
  • Site C Power Pole Relocation

    Type : Bid Notification

    Due : 18 Aug, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 21 Jul, 2020 (about 3 years ago)

    This work shall consist of, but not be limited to, the construction of the underground electrical work required to remove the existing power poles on the site and maintain all the existing electrical feeds.

    From: Southern Nevada Regional Housing Authority (State)

  • Head of Slip C Light Pole Damage

    Type : Bid Notification

    Due : 09 Mar, 2023 (14 months ago)
    Posted : 14 months ago
    Started : 08 Feb, 2023 (15 months ago)

    Alabama State Port Authority Requisition and Proposal Project Name Head of Slip C Light Pole Damage Project No. 11222 Task No. 01 11 | P a g e Form ENG-FR-003 R&P Template Last Revised 1/31/12 SECTION 507 REFERENCED DRAWINGS 507-01 LIST OF DRAWINGS A. Head of Slip C Bulkhead Reference Dwgs. 4454-G2, 4454-P1, 4454-E1 msthomas Line msthomas Typewritten Text damaged pole

    From: Alabama State Port Authority (Port)

  • RFQ 2023-08 for Interstate 80 (I-80) Westbound Cordelia Commercial Vehicle Enforcement Facility (WB I-80 CCVEF) Commercial Vehicle Management System (CVMS)

    Type : Bid Notification

    Due : 19 Jun, 2023 (10 months ago)
    Posted : 11 months ago
    Started : 04 Jun, 2023 (11 months ago)

    NOTE: SCALE: 1" = 20 "S1" LINE M A T C H S H E E T E E 8 - 0 2 M A T C H S H E E T E E 8 - 0 4 SEE SHEET EE8-0 FOR NOTES, ABBREVIATIONS AND LEGEND, SEE ELECTRICAL SITE DETAILS PA SPEAKER POLE SITE DETAILS SEE ELECTRICAL WITH 65 MAST ARM 61-5-100 (Mod) POLE SEE ELECTRICAL SITE DETAILS PA SPEAKER POLE SEE ELECTRICAL SITE DETAILS PA SPEAKER POLE SEE ELECTRICAL SITE DETAILS PA SPEAKER POLE SEE ELECTRICAL SITE DETAILS PA SPEAKER POLE SITE DETAILS SEE ELECTRICAL

    From: Solano Transportation Authority (Transportation)

  • Inspection Service for Lattice Steel Tower and Steel Pole Transmission Structures

    Type : Bid Notification

    Due : 27 Feb, 2024 (2 months ago)
    Posted : 2 months ago
    Started : 05 Feb, 2024 (2 months ago)

    Pole Transmission Structures D) Condition of Insulators 1) Cracking and/or chipping 2) Cleanliness of insulators 3) Spark gaps 4) Isolation transformer 5) Bolts and connections 6) Delamination, UV degradation, rod slippage E) Navigation Lighting F) Foundations 1) Ground condition a) Settlement, movement, or earth cracks b) Erosions c) Site conditions (standing water, drainage, trees, etc.) 2) Anchorage Condition a) Top and bottom base plate nuts

    From: Tacoma (City)

  • Lock C Barge Site Improvements

    Type : Bid Notification

    Due : 07 Aug, 2019 (about 4 years ago)
    Posted : about 4 years ago
    Started : 08 Aug, 2019 (about 4 years ago)

    An organized site visit is tentatively scheduled for Tuesday, Jul 9, 2019. Information regarding the site visit location meeting place, time, etc. will be made available when the complete solicitation package is posted to FBO.Added:Jul 08, 2019 9:58 pmNOTE: An organized site visit is scheduled for Friday, July 12, 2019 at 11:00 a.m. Central Time at Lock C.

    From: Federal Government (Federal)

  • RENOVATION OF 100 LUCERNE LANE ENVIROLAB BUILDING

    Type : Bid Notification

    Due : 14 May, 2024 (in 9 days)
    Posted : 23 days ago
    Started : 27 Mar, 2024 (1 month ago)

    Site Furnishings - None I f. Site Exterior Hardscape – Existing - No new Hardscape planned. 3. Site Civil/ Utilities – All public Utilities are existing. a. Sanitary Sewer – b. Domestic and Fire Sprinkler Water – c. Natural Gas – 4. Site Electrical Utilities a. Electrical Power - Alabama Power Company will supply electrical power requirements. b. Telecommunications – AT&T will supply telecommunication requirements. 5. Other Site Construction a....

    From: Birmingham Water Work (City)

  • Palmer Park Multi-Sports Hub (472895)

    Type : Bid Notification

    Due : 22 Aug, 2019 (about 4 years ago)
    Posted : about 4 years ago
    Started : 23 Jul, 2019 (about 4 years ago)

    Other light poles to be legally dispose off site. Clarification of 1.C. Demolition, concrete removal: Under Demolition, Part C. Concrete Removal: Disregard or eliminate text “Offset 4’ from the back of existing baseball fence and saw cut approximately 65 LF concrete”.   Contract duration:2 years Contract renewal:Not Applicable Prices good for:120 days

    From: Detroit (City)