STABILIZE AND PROTECT KIKSADI FORT SITE FROM WATER EROSION Solicitation ID/Procurement Identifier: 140P2020D0001 Ultimate Completion Date: Thu Mar 31 17:00:00 GMT 2022
Project includes furnishing all labor, materials, and equipment for the construction of a Manganese Treatment System located at the Berkshire Well site, and a dedicated raw-water line from the Kensington Well to the treatment site.
Livingston Avenue, Livingston, New Jersey at which time and place proposals will be opened in the Council Chambers and publicly read for: BID NO. 20-2021- Removal and Off-Site Disposal of Liquid Sludge from the Water Pollution Control Facility Bid documents and specifications can be downloaded for no charge online (upon registration). Bid specifications and other information may be obtained on Thursday, December 9, 2021.
Energy Authority to use the site to divert water from the West Fork Upper Battle Creek drainage and convey it to Bradley Lake to supplement the power generating capacity for the Bradley Lake Hydroelectric Project.
Removal and off-site disposal of sediment and zebra mussels from the existing raw water pump station wet well and three existing intake pipelines. Pre-Bid Details Date: 6/17/2022 Time: 10:00 AM Location: GBRA Western Canyon WTP, 4775 S. Cranes Mill Road, Canyon Lake, TX 78132 Notes: Site visit will occur after the pre-bid conference.
Livingston Avenue, Livingston, New Jersey at which time and place proposals will be opened in the Council Chambers and publicly read for: BID NO. 30-2017- Removal and Off-Site Disposal of Liquid Sludge from the Water Pollution Control Facility Bid documents and specifications can be downloaded for no charge online at www.livingstonnj.org/finance (upon registration) or picked up at
Irrigation system shall be altered to water efficiently with new layout. A retention pond shall be constructed on the south east corner of the site to aid in collecting storm water from the site. New light poles are included in the project to enhance night visibility. Added on Feb 4, 2020:Adding a per unit cost for soils. Provide unit cost for sub base material.
Reef substrate will be installed per the plan drawings and specifications on the project site in water depths ranging from approximately 12 feet mean lower low water, MLLW, to 14 feet MLLW. CONSTRUCTION TIME The Norfolk District is considering awarding a stand-alone C contract that includes a period of performance of 9 months. The entire contract award amount, including options, is not to exceed $4,500,000.
The facility consists of the underground mine, a surface gold mill, a drystack tailings facility, two man camps, road access and power distribution, and a water management system for water treatment and discharge.The proposed final APDES permit allows for two outfalls that discharge to the Goodpaster River. Outfall 001 consists of treated contact water from the mine site and drainage from the underground mine.