Search results for: site from water

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 512
  • SITK-224618. STABILIZE AND PROTECT KIKSADI FORT SITE FROM WATER EROSION

    Type : Contract

    Due : 31 Mar, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 01 Nov, 2021 (about 2 years ago)

    STABILIZE AND PROTECT KIKSADI FORT SITE FROM WATER EROSION Solicitation ID/Procurement Identifier: 140P2020D0001 Ultimate Completion Date: Thu Mar 31 17:00:00 GMT 2022

    From: Federal Procurement Data System (Federal)

  • Catalyst Water Main Extension

    Type : Bid Notification

    Due : 28 Dec, 2023 (3 months ago)
    Posted : 2 months ago
    Started : 13 Dec, 2023 (3 months ago)

    Project Description: The project consists of extending the existing potable water transmission system for the Catalyst site from the existing water treatment plant located north of US 90 to the interchange at I-10. The construction will consist of +/- 17,000 LF of 12-inch PVC water main, including a jack and bore railspur crossing and appurtenances. C. Owner requires the Project to be completed in 180 calendar days. D.

    From: Suwannee (County)

  • WATER PURIFICATION,

    Type : Bid Notification

    Due : 01 Apr, 2024 (in 2 days)
    Posted : 2 days ago
    Started : 26 Mar, 2024 (3 days ago)

    OF DOCUMENT BEING CONTINUED: CONTINUED ON NEXT PAGE PAGE 6 OF 24 PAGES SPE2DH-24-T-2303 SECTION B PR: 7006946061 NSN/MATERIAL:6520015352663 ITEM DESCRIPTION WATER PURIFICATION, WATER PURIFICATION,TABLETS ICX WATERLINE TREATMENT TABLETS; SINGLE DISPENSING PACKETS, 0.7 LITER TABLETS. UNIT OF ISSUE: PACKAGE (50 TABLETS/PACKAGE) ..

    From: Federal Government (Federal)

  • Request for Bids to Construct Raw Water Transmission Piping with Well Site

    Type : Bid Notification

    Due : 19 Oct, 2023 (5 months ago)
    Posted : 6 months ago
    Started : 04 Sep, 2023 (6 months ago)

    The County of Currituck, North Carolina requests bids from qualified contractors to: construct raw water transmission piping associated with well site RO4. The raw water transmission line will run from Well Site RO4 to the Mainland Water Treatment Plant. Well Site RO4 and the Mainland Water Treatment Plant are located on Maple Road in Currituck County, North Carolina.

    From: Currituck (County)

  • Chesapeake Bay Oyster Recovery Program, Piankatank River, Virginia Phase 2 Reef Habitat

    Type : Bid Notification

    Due : 01 Sep, 2022 (19 months ago)
    Posted : 23 months ago
    Started : 08 Sep, 2022 (18 months ago)

    Reef substrate will be installed per the plan drawings and specifications on the project site in water depths ranging from approximately 0.96’ MLLW to 0.10’ MLW

    From: Federal Government (Federal)

  • Lynnhaven River Basin Phase II Reef

    Type : Bid Notification

    Due : 26 Oct, 2023 (5 months ago)
    Posted : 6 months ago
    Started : 31 Oct, 2023 (4 months ago)

    Reef substrate will be installed per the plan drawings and specifications on the project site in water depths ranging from approximately 7.0? MLLW to 8.3? MLLW. The construction period of performance will be approximately 720 days from issuance of the NTP.

    From: Federal Government (Federal)

  • Terra Linda Parking Lot Enhancement

    Type : Bid Notification

    Due : 06 Feb, 2020 (about 4 years ago)
    Posted : about 4 years ago
    Started : 23 Jan, 2020 (about 4 years ago)

    Irrigation system shall be altered to water efficiently with new layout. A retention pond shall be constructed on the south east corner of the site to aid in collecting storm water from the site.  New light poles are included in the project to enhance night visibility.   Added on Feb 4, 2020:Adding a per unit cost for soils. Provide unit cost for sub base material.

    From: Utah (State)