Search results for: software system replacement

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 5 of 5
  • Surface Surveillance Sustainment - the Runway Status Lights (RWSL) Processor (RP) and Router Replacement- Market Survey

    Type : Bid Notification

    Due : 16 May, 2024 (in 12 days)
    Posted : 1 day ago
    Started : 02 May, 2024 (1 day ago)

    Requirement Description The subject proposed procurement is anticipated for the provision of the following products and services: Design, development, integration and testing for the replacement of the RP system computers, communications and peripheral components shown in Table 1; Replacement of computer software Operating System with the Red-Hat Enterprise Linux operation system software, including integration with current RWSL system interfaces,

    From: Federal Government (Federal)

  • In-Service Engineering and Life Cycle Support for C5I Elements

    In-Service Engineering and Life Cycle Support for C5I Elements

    Type : Award

    Due : 03 May, 2024 (Yesterday)
    Posted : 23 days ago
    Started : 10 Apr, 2024 (23 days ago)

    (GDMS) is responsible for providing overall in-service engineering and life cycle support for Command, Control, Communications, Computers, Combat Systems and Intelligence (C5I) systems critical engineering; design; integration; test and evaluation software development, testing, and load; system upgrade/replacement planning onboard and at sites; logistics product development and distribution; configuration management of the systems and logistics products

    From: Federal Government (Federal)

  • The Richlands Wastewater Treatment Plant Upgrade Project

    Type : Bid Notification

    Due : 10 May, 2024 (in 6 days)
    Posted : 17 days ago
    Started : 02 Apr, 2024 (1 month ago)

    Yard Piping Replacement  Laboratory Instrumentation & Supplies  New Automatic Samplers  Bypass Pumping during Construction  Closed Circuit Security Camera System  Electrical & controls replacements throughout plant  SCADA Update (Software, Interfaces, PLCs)  8 ft.

    From: Richlands (Town)