Search results for: southern corridor

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 51
  • Southern Corridor Final Design

    Type : Bid Notification

    Due : 20 Dec, 2022 (16 months ago)
    Posted : 16 months ago
    Started : 02 Dec, 2022 (17 months ago)

    The scope of services include Wake BRT: Southern Corridor Final Design. WAKE BRT: SOUTHERN CORRIDOR FINAL DESIGN This section of the Scope of Work focused on advancing the Wake BRT: Southern Corridor in design from 30% design to 100% design. This part of the scope will be delivered in close coordination and partnership with the Engineering Services Department.

    From: Raleigh (City)

  • Wake BRT: Southern Corridor Final Design

    Type : Bid Notification

    Due : 20 Jan, 2023 (15 months ago)
    Posted : 16 months ago
    Started : 21 Dec, 2022 (16 months ago)

    Answer: Wake BRT: Southern Corridor 30% Design Plans are not anticipated till Spring- Summer 2023. Wake BRT: Southern Corridor 10% Design Plans are provided.

    From: Raleigh (City)

  • Redmond Trail along Norfolk Southern Corridor

    Type : Bid Notification

    Due : 26 Mar, 2021 (about 3 years ago)
    Posted : about 3 years ago
    Started : 19 Feb, 2021 (about 3 years ago)

    Redmond Trail along Norfolk Southern Corridor Bid Number: 21-015 Agency: Floyd County Solicitation Type: RFP/Bid Due Date: 03/26/2021 02:00 PM

    From: Rome (City)

  • Property Conveyance for Affordable Housing Development

    Type : Bid Notification

    Due : 22 Mar, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 07 Mar, 2022 (about 2 years ago)

    In January 2019, planning of the City of Raleigh’s Southern BRT Corridor began with a study to help identify a preferred route for transit extending from downtown Raleigh to the Town of Garner. This work built upon the Southern Gateway Corridor Study completed in 2017 and the Wake Transit Plan Major Investment Study completed in 2018.

    From: Wake County (County)

  • Alameda Corridor Southern Terminus Gap Closure

    Type : Bid Notification

    Due : 30 Jul, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 25 Jun, 2020 (about 3 years ago)

    General Information BAVN ID: 40189 Category:ConstructionType: Request For Bid Description: The Project consists of constructing a railroad track extension of the Trapac lead track to the San Pedro main line track alongside the existing main line track south of Harry Bridges Boulevard, including rail tie-ins to existing tracks, turnouts and crossovers, reconstruction of West Basin Container Terminal lead tracks, track drains, and extension of grade crossing modules. Work also includes demolition of fences, installing new asphalt concrete pavement, restriping main gate lanes, and other improvements. In addition, the Work includes installation of fencing with K-rail, striping, installation of steel pipe casings and concrete slabs at existing u...

    From: Los Angeles World Airports (Airport)

  • Alameda Corridor Southern Terminus Gap Closure

    Type : Bid Notification

    Due : 30 Jul, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 25 Jun, 2020 (about 3 years ago)

    The Project consists of constructing a railroad track extension of the Trapac lead track to the San Pedro main line track alongside the existing main line track south of Harry Bridges Boulevard, including rail tie-ins to existing tracks, turnouts and crossovers, reconstruction of West Basin Container Terminal lead tracks, track drains, and extension of grade crossing modules. Work also includes demolition of fences, installing new asphalt concrete pavement, restriping main gate lanes, and other improvements. In addition, the Work includes installation of fencing with K-rail, striping, installation of steel pipe casings and concrete slabs at existing utilities that cross under new railroad tracks including driving piles under a new concrete ...

    From: Los Angeles Business Assistance Virtual Network (Other)

  • Wake Bus Rapid Transit (BRT) Technology Components

    Type : Bid Notification

    Due : 29 Jul, 2022 (21 months ago)
    Posted : 23 months ago
    Started : 23 May, 2022 (23 months ago)

    The plan envisions that Wake BRT would be deployed along the following four (4) corridors, covering approximately 20 miles: 1) New Bern Avenue corridor from Downtown Raleigh to New Hope Road 2) Western corridor from Downtown Raleigh to Downtown Cary 3) Southern corridor from Downtown Raleigh to Garner 4) Northern corridor from Downtown Raleigh to North Raleigh The goal is to implement all planned BRT corridors by 2030 with the first BRT project being

    From: Raleigh (City)