Search results for: spillways and dam

Showing opportunity 1 - 10 of 28
  • Prado Dam Spillway Modification Project

    Type : Bid Notification

    Due : 01 May, 2024 (in 6 days)
    Posted : 4 months ago
    Started : 29 Mar, 2024 (26 days ago)

    Project Title: Prado Dam Spillway Modification Project. This solicitation and resulting contract are utilizing the Best Value Trade-off process in accordance with (IAW) FAR Part 15. This acquisition uses the Integrated Design and Construction (IDaC) delivery method. The NAICS Code for this project is 237990, Other Heavy and Civil Engineering Construction. The size standard is $45,000,000.00.

    From: Federal Government (Federal)

  • Cheatham Dam Spillway Gate Electrical Components Replacement

    Type : Pre-Bid Notification

    Due : 31 May, 2024 (in 1 month)
    Posted : 22 hours ago
    Started : 23 Apr, 2024 (1 day ago)

    The contract will consist of a base and five (5) options. The base includes mobilization and demobilization, performance and payment bonds, demolition and replacement of controls, motors, and brake components for spillway gates 1-2 and shall include asbestos abatement work.

    From: Federal Government (Federal)

  • USACE--Tulsa District Tenkiller Spillway Bridge Replacement

    Type : Bid Notification

    Due : 03 May, 2024 (in 8 days)
    Posted : 5 days ago
    Started : 19 Apr, 2024 (5 days ago)

    Small businesses, Section 8(a), HUB-Zone, SDVOSB, and WOSB businesses are highly encouraged to participate.Tenkiller Lake is a multi-purpose project providing flood risk management, hydroelectric power, water supply, navigation, fish and wildlife, and recreation.The project is operated for optimum flood risk management in the Illinois River basin as part of the larger Arkansas River Basin.The Tenkiller Lake Main Spillway bridge was originally constructed

    From: Federal Government (Federal)

  • East Fork of Rock Creek Dam Rehabilitation

    Type : Bid Notification

    Due : 15 May, 2024 (in 20 days)
    Posted : 22 days ago
    Started : 01 Apr, 2024 (24 days ago)

    Specifically, work includes but is not limited to: demolishing the existing concrete spillway, constructing a concrete labyrinth spillway, constructing a seepage control berm, extending the existing outlet conduit approximately 100 feet, refurbishing the outlet conduit and valves, constructing a new gatehouse with a pedestrian bridge, installing new instrumentation, and building a new concrete bridge over the spillway approach channel.

    From: Montana (State)

  • Construction of Thatcher Run PA-112 Conneautville Dam Rehabilitation, Crawford County, PA.

    Type : Bid Notification

    Due : 23 May, 2024 (in 28 days)
    Posted : 26 days ago
    Started : 23 Apr, 2024 (1 day ago)

    of a sheetpile wall along the left side of the auxiliary spillway; lime treatment of surficial dispersive soils on the embankment, auxiliary spillway, and training dike; reconfiguration of the 8-inch diameter embankment drain pipes in the vicinity of the principal spillway impact basin; construction of a filter diaphragm below the existing principal spillway outlet conduit; and replacement of the existing trash rack installed on the inlet structure.Due

    From: Federal Government (Federal)

  • DALE HOLLOW <b>DAM</b> <b>SPILLWAY</b> GATE RECOATING AND MACHINERY <b>CONTROL</b> REHABILITATION

    DALE HOLLOW DAM SPILLWAY GATE RECOATING AND MACHINERY CONTROL REHABILITATION

    Type : Contract

    Due : 12 Mar, 2025 (in 10 months)
    Posted : 4 months ago
    Started : 30 Mar, 2024 (25 days ago)

    DALE HOLLOW DAM SPILLWAY GATE RECOATING AND MACHINERY CONTROL REHABILITATION Solicitation ID/Procurement Identifier: W912P522R0006 Ultimate Completion Date: Wed Mar 12 17:00:00 GMT 2025

    From: Federal Procurement Data System (Federal)

  • RFP - Trader's Point Spillway Improvements

    Type : Bid Notification

    Due : 31 Dec, 2026 (in about 2 years)
    Posted : 22 months ago
    Started : 30 May, 2022 (23 months ago)

    It was recommended that a Professional Engineer be engaged in evaluation of the structure, recommendation on how to repair or replace the spillway, and design of a new spillway if needed. A structural analysis of the spillway was completed in 2020.

    From: Indiana Finance Authority (State)