Type : Pre-Bid Notification
Counter Balance system.Airdyne SABIR Door Assembly Kit.
Counter Balance system.Airdyne SABIR Door Assembly Kit.
Total quantity of shock absorbing spring loaded casters needed is 144; 72 casters must have swivel and locking brakes and 72 casters must be rigid (non-swivel).
Material Description 1 ) SPRING LOADED SANDWICH TYPE NRV, SIZE : 50NB PN 40, MATERIAL :SS316 - MATERIAL PICTURE ATTACHED | QTY: 05 EA 2 ) SPRING LOADED SANDWICH TYPE NRV, SIZE : 40NB PN 40, MATERIAL :SS316 - MATERIAL PICTURE ATTACHED| QTY: 05 EA WAFER TYPE FOR ACETYLENE GAS GENERATOR PLEASE ATTACH DATA SHEET AND PICTURES ALONG YOUR QUOTE "Note 1- " Your offer should be submitted with detailed specifications like dimensions, quality, brand (with photos
/DIV/CENTRAL RLY TENDER DOCUMENT Tender No: 93215159A Closing Date/Time: 12/07/2021 11:30 S.No Description Payment Terms 1 100% payment against receipt, inspection and acceptance of material by the consignee at destination. Statutory Variation Clause S.No Description 1 Statutory Variation in taxes and duties, or fresh imposition of taxes and duties by State/ Central Governments in respect of the items stipulated in the contract (and not the raw materials thereof), within the original delivery period stipulated in the contract, or last unconditionally extended delivery period shall be to Railways' account. Only such variation shall be admissible which takes place after the submission of bid. No claim on account of statutory variation in resp...
/DIV/CENTRAL RLY TENDER DOCUMENT Tender No: 93215159 Closing Date/Time: 10/06/2021 11:30 S.No Description Payment Terms 1 100% payment against receipt, inspection and acceptance of material by the consignee at destination. Statutory Variation Clause S.No Description 1 Statutory Variation in taxes and duties, or fresh imposition of taxes and duties by State/ Central Governments in respect of the items stipulated in the contract (and not the raw materials thereof), within the original delivery period stipulated in the contract, or last unconditionally extended delivery period shall be to Railways' account. Only such variation shall be admissible which takes place after the submission of bid. No claim on account of statutory variation in respe...
Added:Jul 05, 2019 2:42 pm SEE ATTACHMENTS FOR SOLICATION INFORMATION
The United States Coast Guard Surface Forces Logistics Center has a requirement and requesting quotations for the following part:Item 1)NSN: 4320-01-670-5724SEAL ASSY SHAFT SPRING LOADEDHYDRAULIC LAUNCHING & RECOVERING SYSTEM, STERN DOOR.JASTRAM SS 350 CYLINDERINDIVIDUALLY PACKAGED IN ACCORDANCE WITH MIL-STD-2073-1E METHOD 10, UTILIZING CUSHIONING, BLOCKING AND BRACING INSIDE A TYPE V, STYLE B COVERED CRATE WITH LAG BOLTS CONFORMING TO ASTM D6039