Search results for: squalicum harbor

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 11
  • Gate 1 and Squalicum Harbor Maintenance

    Type : Bid Notification

    Due : 22 Oct, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 07 Oct, 2021 (about 2 years ago)

    NOTICE OF BID Notice is hereby given that sealed bids for the Gate 1 and Squalicum Harbor Maintenance project located in Bellingham, Washington will be received at the Administrative Offices of the Port of Bellingham, 1801 Roeder Avenue, Bellingham, Washington until 10:00 a.m.,Friday, October 22, 2021. The official time shall be taken from the designated clock at the Administrative Offices.

    From: Port of Bellingham (Port)

  • Marine Infrastructure Condition Surveys

    Type : Bid Notification

    Due : 26 Mar, 2024 (1 month ago)
    Posted : 2 months ago
    Started : 28 Feb, 2024 (2 months ago)

    The reports for Blaine Harbor, Squalicum Harbor and Fairhaven need to be separate documents.

    From: Port of Bellingham (Port)

  • Port-wide Bulkhead and Pier Repair Replacement

    Type : Bid Notification

    Due : 07 Feb, 2023 (14 months ago)
    Posted : 16 months ago
    Started : 20 Dec, 2022 (16 months ago)

    Proposed work at three project locations includes: • Blaine Harbor: Demolition, removal and replacement of approximately 320 lineal feet of failing sheet pile wall with a new coated steel sheet pile or composite sheet pile bulkhead wall. • Squalicum Harbor: Removal and replacement or repair of piling, pile caps, deck, cross bracing, and floats in multiple wharf sections along Squalicum Way, which serves Bellingham Cold Storage and other Port tenants

    From: Washington State Office of Minority and Women (State)

  • Port of Bellingham - Photovoltaic System Planning, Design, and Construction Support

    Type : Bid Notification

    Due : 09 May, 2023 (11 months ago)
    Posted : 12 months ago
    Started : 24 Apr, 2023 (12 months ago)

    Potential Project Locations: Blaine Harbor Webhouse 2-3, International Trade Building, Squalicum Harbor Webhouses 1-5. Photovoltaic System Design and Permitting Project Management: Scheduling, contract administration, leading a multiple-discipline team, and coordination with consultant team, owner, regulatory agencies, and project stakeholders.

    From: Washington State Office of Minority and Women (State)

  • Port-wide Bulkhead and Pier Repair Replacement

    Type : Bid Notification

    Due : 07 Feb, 2023 (14 months ago)
    Posted : 16 months ago
    Started : 20 Dec, 2022 (16 months ago)

    Proposed work at three project locations includes: • Blaine Harbor: Demolition, removal and replacement of approximately 320 lineal feet of failing sheet pile wall with a new coated steel sheet pile or composite sheet pile bulkhead wall. • Squalicum Harbor: Removal and replacement or repair of piling, pile caps, deck, cross bracing, and floats in multiple wharf sections along Squalicum Way, which serves Bellingham Cold Storage and other Port tenants

    From: Ben Franklin Transit (Transportation)

  • Port of Bellingham - Photovoltaic System Planning, Design, and Construction Support

    Type : Bid Notification

    Due : 09 May, 2023 (11 months ago)
    Posted : 12 months ago
    Started : 28 Mar, 2023 (13 months ago)

    Potential Project Locations: Blaine Harbor Webhouse 2-3, International Trade Building, Squalicum Harbor Webhouses 1-5. Photovoltaic System Design and Permitting Project Management: Scheduling, contract administration, leading a multiple-discipline team, and coordination with consultant team, owner, regulatory agencies, and project stakeholders.

    From: Ben Franklin Transit (Transportation)

  • Westman Marine and Weldcraft Steel & Marine Cleanup Sites Remedial Design and Permitting

    Type : Bid Notification

    Due : 09 Jul, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 17 Jun, 2021 (about 2 years ago)

    The Westman site is located within the Blaine Marine Industrial Area in Blaine, Washington, while the Weldcraft site is located within the Squalicum Outer Harbor in Bellingham, Washington. Contamination from historic boatyard operations has impacted the upland and marine sediment of both sites with a variety of constituents such as petroleum hydrocarbons, polycyclic aromatic hydrocarbons, and metals.

    From: Port of Bellingham (Port)