Search results for: stack renewal

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 11
  • Elastic stack renewal

    Type : Bid Notification

    Due : 23 Sep, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 24 Aug, 2021 (about 2 years ago)

    Refer to the redacted EFOJ attached.

    From: Federal Government (Federal)

  • Sources Sought - USNS HENRY J. KAISER FY24 MTA

    Type : Bid Notification

    Due : 21 Apr, 2023 (12 months ago)
    Posted : 13 months ago
    Started : 06 Apr, 2023 (13 months ago)

    The estimated issue date of the solicitation is on or about 10 June 2023.Major work items associated with this availability include: General Services For Ship, Clean And Gas Free Tanks, Voids, Cofferdams, And Spaces, Misc Steel Repairs, Bulwark Repairs , 01 Level Expansion Joints, Main Engine Clutch Maint, Renewal Main Engine Exh Stack Resilient Mounts, SSDG 24K Overhaul, PTO Clutch & Coupling, Transfer Head Sliding Block Refurbishment And Chain Replacement

    From: Federal Government (Federal)

  • Kitchen Equipment

    Type : Bid Notification

    Due : 20 May, 2022 (23 months ago)
    Posted : about 2 years ago
    Started : 06 May, 2022 (about 2 years ago)

    Definition: Double Stack Oven: 2 ovens stacked one on top of the other, for a total of 2 ovens per Double Stack. Classification codes: View classification codesContract duration:365 daysContract renewal:1 annual renewalPrices good for:90 daysRegions:Utah, Weber Please log in to see Bid details or to add this to My Bids. If you are not registered, please register for free. Login

    From: Utah (State)

  • TRACKER RENEWAL

    Type : Contract

    Due : 15 Aug, 2023 (8 months ago)
    Posted : 20 months ago
    Started : 19 Aug, 2022 (20 months ago)

    TRACKER RENEWAL Solicitation ID/Procurement Identifier: 15DDSD22P00000039 Ultimate Completion Date: Tue Aug 15 17:00:00 GMT 2023

    From: Federal Procurement Data System (Federal)

  • USS MT WHITNEY ESLP FY19

    Type : Bid Notification

    Due : 03 Apr, 2018 (about 6 years ago)
    Posted : about 6 years ago
    Started : 12 Mar, 2018 (about 6 years ago)

    Major work items associated with this availability include: Steel Deck Replacement in P-Way 3-108-1 from Sponson, Engine Room Cribbing Repairs & Replacements, Liferaft Embarkation Ladder Port Side Sail Locker Modifications, 4-31-1 Steel Repairs, Blast & Coat, Steel Replacement in Aft AC Flat #2, Port FWD Troop Ladder Door Dog Latches & Steel Renewal, SS/EDG Stack Ladder Installation, 9-98-1/2-W Steel Replacement, Foundation Replacement In Way of MRG

    From: Federal Government (Federal)

  • USNS PATUXENT (T-AO 201) MID-TERM AVAILABILITY

    Type : Bid Notification

    Due : N/A
    Posted : about 8 years ago
    Started : 29 Jan, 2016 (about 8 years ago)

    MAJOR WORK ITEMS ASSOCIATED WITH THIS AVAILABILITY INCLUDE: MAIN & EMERGENCY SWITCHBOARD CLEANING; GROUP CONTROL CENTERS AND MOTOR CONTROLLERS CLEANING; NO.1 BALLAST PUMP & MOTOR OVERHAUL; LIFEBOATS DAVIT REPAIR AND MAINTENANCE; TANK DECK OVERHEAD PAINTING; CT WINCH CONTROLLER REPLACEMENT; CARGO POTABLE WATER TANK PRESERVATION; STEAM AND CONDENSATE PIPING RENEWAL ON TANK DECK OVERHEAD; BOILER STACK CLEANING; ME LUBE OIL SERVICE PUMP NO.1 & NO.2 OVERHAUL

    From: Federal Government (Federal)

  • DRY-DOCK & REPAIRS OF CGC ALEX HALEY (WMEC 39)

    Type : Bid Notification

    Due : 22 Sep, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 01 Sep, 2021 (about 2 years ago)

    , Hangar Stuffing Tube, Installation SSDG Exhaust Stacks, Inspect MDE Exhaust Stacks, Inspect U/W Body, Preserve (Partial - Condition A) Rudder And Rudder Stock, Remove, Inspect & Repair Main Reduction Gear, Repairs Controllable Pitch Propeller System Maintenance CPP Hubs, Renew Waterborne Bearings, Overhaul Propulsion Shafting, Remove Propulsion Shafting, Inspect and Package Propulsion Shafting, Install Preparations Propulsion Shafting, Install Propulsion

    From: Federal Government (Federal)