Type : Bid Notification
Hemlock Valley Fire Hall - Stair Case Design Project Description :RFQ - 22013 - Hemlock Valley Fire Hall - Stair Case Design
Hemlock Valley Fire Hall - Stair Case Design Project Description :RFQ - 22013 - Hemlock Valley Fire Hall - Stair Case Design
Occupancy Insert Building Occupancy Type Business Size In Square Feet Occupancy Load Egress Width Required # of Occupants X width per person, level & stairs.
215 H 215 I 215 J 215 L 215 N Stair Up Additional 1,060 SF STAGE Exit Stair Exit Stair Down Up Up 210 C 210 E 210 D 210 B storage 210 A 210 G Stair Up 210 H 210 I Dark Room UPWARD BOUND UPWARD BOUND About 2,200 SF usable space either side, storage is not standing height About 4,400 SF gym floor space PRODUCED BY AN AUTODESK STUDENT VERSION PR O D U C ED B Y A N A U TO D ES K S TU D EN T VE R SI O N PRODUCED BY AN AUTODESK STUDENT VERSION PR O D U
The sequence will interrupt the stair pressurization to allow occupancy.
.• ABA/ADA compliant signage will be provided inside and outside of the stair enclosures.• Handrails and metal stair tread riser panels will be added between ground level and junction level to the existingfire exit stairs in the ATCT.• Replace new room signage in both the Base Building and ATCT.• Remediate mold contamination, previously identified at interior walls and at perimeter unit heaters.
“Sealed Bid Enclosed for Water Resources Administration Building Entrance Stair Repairs"; b. Bid Number 2024-010; PM - 25 c. The bidder’s name and address; d.
circa 1930. 65 Evaluate and correct deficiencies to current code requirements at the interior egress stair railings....