Type : Bid Notification
B17 NE Stairwell VCT & Tread replacement: Installation of new treads & VCT in 6 level stairwell January 14 thru January 20, 2021.
B17 NE Stairwell VCT & Tread replacement: Installation of new treads & VCT in 6 level stairwell January 14 thru January 20, 2021.
Stairwell Tread Replacement inside the building as per drawings and specifications contained in the ITT.
Design services for, Jessie Parker – Cosmetic Improvements to ceiling grid/tiles (grid caps / replacement of tile) and addressing any flooring/stair tread issues (broken VCT tile, etc.); Grimes Building – Replacing stairwell tread’s and riser’s VCT Tiles throughout both interior stairwells. Stairwell mastic has been confirmed to be asbestos containing and will need abated.
Type: Online Submissions Only Submission Address: Online Submissions Only Public Opening: No Description: The District of Thunder Bay Social Services Administration Board (TBDSSAB) invites Bid Submissions (Bids) from qualified contractors to paint stair treads and stairwell landings, and for the removal and replacement of corridor carpet for the second, fourth, and sixth floors at Spence Court – 230 Amelia Street West, Thunder Bay, ON.Completion
THE PURPOSE OF THIS PROJECT IS TO REPAINT THE STAIRWELL LANDINGS, RISERS, TREADS, AND HAND RAILINGS IN STAIRWELL 1 AT THE LITTLE ROCK FEDERAL OFFICE BUILDING 700 W CAPITOL AVE. LITTLE ROCK, AR. Solicitation ID/Procurement Identifier: 47PH0523Q0026 Ultimate Completion Date: Mon Aug 21 17:00:00 GMT 2023
Project #:0987201 222-3268Scope:This project renovates finishes, floors & stair treads in 12 stairwells at UIHC: Per the stair study stair #s are as follows:12,13,21,23,28,30,33,36,40,44,51,and 53.Building:UIHCProject Status:ConstructionProject Manager:Edward P Scherrer edward-scherrer@uiowa.eduEstimated Construction Cost:$1,521,980.00Pre Bid Date:5/8/23Pre Bid Location:Room HPR3 SB5
Project #:0987201 222-3268Scope:This project renovates finishes, floors & stair treads in 12 stairwells at UIHC: Per the stair study stair #s are as follows:12,13,21,23,28,30,33,36,40,44,51,and 53.Building:UIHCProject Status:DesignProject Manager:Edward P Scherrer edward-scherrer@uiowa.eduEstimated Construction Cost:$1,805,200.00Pre Bid Date:5/8/23Pre Bid Location:Room HPR3 SB5 – Capital