Type : Bid Notification
In September 2021, the Capitol Square Review and Advisory Board (CSRAB) received the results of a Facility Condition Assessment Report that detailed recommendations for electrical systems upgrades throughout the CSC. Much of the existing electrical equipment in the Statehouse dates back to the early 1990s and 1960s. Due to the age of the equipment, it was recommended that the majority of the electrical infrastructure be replaced.