Search results for: station and effluent filter

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 92
  • SCWWA Nutrient Reduction Projection Phase 3 Improvements

    Type : Bid Notification

    Due : 08 May, 2024 (in 6 days)
    Posted : 1 month ago
    Started : 27 Mar, 2024 (1 month ago)

    Aluminum Sulfate  Junction Box 2 and 3 Improvements  Filter Effluent Caustic Feed Facility  Electrical Power Supply and Distribution  Fiber Optic Improvements  Instrumentation and Controls  Incidental related work The Authority will award the contract on a lump sum bid basis.

    From: Virginia (State)

  • McAlpine Creek Wastewater Management Facility Low Lift Pump Station and Effluent Filter Improvements

    Type : Bid Notification

    Due : 14 Oct, 2022 (18 months ago)
    Posted : 20 months ago
    Started : 29 Sep, 2022 (19 months ago)

    College St., Charlotte, NC 28206 Online – http://planroom.richa.com This Project includes the replacement of two existing slide gates and electric actuators at the Low Lift Pump Station and Effluent Filters facilities.

    From: Charlotte (City)

  • Y1PC--Tahoma National Cemetery, Ph 3

    Type : Pre-Bid Notification

    Due : 10 Jul, 2024 (in 2 months)
    Posted : 20 days ago
    Started : 11 Apr, 2024 (20 days ago)

    Admin building: Replace effluent filter. PIC building: Removal of FboNotices and repair risers at the point where the intrusion is occurring and replace effluent filter. Existing columbaria: Replace caulking throughout existing columbaria. Public Information Center improvements to include restroom renovations, cabinetry repairs/replacement, and removal/replacement of display case.

    From: Federal Government (Federal)

  • Simsboro Aquifer Water Supply Facilities - Package 3 - Treatment Equipment Procurement

    Type : Bid Notification

    Due : 15 Sep, 2022 (19 months ago)
    Posted : 20 months ago
    Started : 31 Aug, 2022 (20 months ago)

    It will consist of chemical addition facilities housed in a chemical building and gravity filters housed in a filter building.

    From: Archer Western Construction (Other)

  • Simsboro Aquifer Water Supply Facilities - Package 10 - Filter and Chemical Buildings at WTP

    Type : Bid Notification

    Due : 15 Sep, 2022 (19 months ago)
    Posted : 20 months ago
    Started : 31 Aug, 2022 (20 months ago)

    It will consist of chemical addition facilities housed in a chemical building and gravity filters housed in a filter building.

    From: Archer Western Construction (Other)

  • Simsboro Aquifer Water Supply Facilities - Package 5 - Electrical and I&C Construction

    Type : Bid Notification

    Due : 15 Sep, 2022 (19 months ago)
    Posted : 20 months ago
    Started : 31 Aug, 2022 (20 months ago)

    It will consist of chemical addition facilities housed in a chemical building and gravity filters housed in a filter building.

    From: Archer Western Construction (Other)

  • Village Of Swanton - Wastewater Treatment Facility Upgrade, Contract No. 1

    Type : Bid Notification

    Due : 15 May, 2024 (in 13 days)
    Posted : 15 days ago
    Started : 16 Apr, 2024 (15 days ago)

    The Project includes the following Work: The project consists of the construction and installation of a new steel framed structure and tertiary filter system, effluent pumping system, chemical storage tank, lagoon baffle curtain, and electrical distribution systems at the WWTF and Pump Station.

    From: Vermont (State)