Search results for: steel and light poles

Showing opportunity 1 - 10 of 18
  • Sign Posts and Parts, Breakaway

    Type : Bid Notification

    Due : 01 May, 2024 (in 10 days)
    Posted : 16 days ago
    Started : 03 Apr, 2024 (17 days ago)

    , STONE 57044 - POSTS, STEEL (FOR DELINEATOR MARKERS, MILE MARKERS, ETC.) 80183 - SIGNS, METAL (NOT BLANKS) 80186 - SIGNS, MISCELLANEOUS, NOT ELSEWHERE 80195 - SIGNS, SURGE MARKER, METAL 80196 - SIGNS, TRAFFIC, SOLAR POWERED, LED, FLASHING, PROGRAMMABLE License Requirements Department Office of Procurement and Contract Admin Address 6751 Columbia Gateway Drive Suite 226 Columbia, Maryland 21046 County Howard Bid Valid Liquidated Damages Estimated

    From: Howard County (County)

  • Mowing and Litter Control - Landfill (2) locations

    Type : Bid Notification

    Due : 17 Apr, 2024 (3 days ago)
    Posted : 14 days ago
    Started : 22 Mar, 2024 (29 days ago)

    1 re FENCE LINE OVERHEAD UTILITIES oHU 07-03-23 | 90% CDs/RFI CONST #0023 = Se 7 -= L UNDERGROUND ELECTRIC UGE UGE uc UGC 1A\dwg\2230323.1 | _ GAS | COMMUNICATIONS i a OO |__|} SOIL BORING > SB #1 - | BOLLARD POST POST A SITE 24 DRIV LMONT N-S 1/4 LINE SI | B GAS \-\ SV9 GATE fewer mene ome 24 UTILITY RISERS ST Eles Gas Des Bes Ors OpU ps 77/2 | UTILITY POLE 1 STORY SHED Rees STEEL CONTAINER LIGHT POLE | o Sv!

    From: Kent County Administration (County)

  • Parking Lot Modifications - Riverside High ***DRAWINGS***

    Type : Bid Notification

    Due : 13 May, 2024 (in 22 days)
    Posted : 2 days ago
    Started : 03 Apr, 2024 (17 days ago)

    LAP SPLICE CIRCULAR TIE DETAIL 3/4" = 1'-0" LEVELING NUT PLATE WASHER (PER LIGHT POLE MANUFACTURER) LIGHT POLE BASE PLATE STRUCTURAL NUT LOCK NUT SLOPE TOP OF FOUNDATION 1/4" PER FOOT TO SHED WATER 3" CLR TYP. (8) #5 VERTICAL REINFORCING BAR #4 CIRCULAR TIE 3" C LR T YP . LIGHT POLE SEE LIGHT POLE BASE ON TOP OF FOUNDATION DETAIL (8) #5 VERTICAL BARS (2) 1"Ø PVC CONDUIT (4) 1"Ø ANCHOR BOLTS #4 CIRCULAR TIES 4' -6 ' 3' -6 ' 4"Ø SCH 40 GALV.

    From: Greenville County Schools (School)

  • ​Barton/Bandemer Park Pedestrian Tunnel Project

    Type : Bid Notification

    Due : 08 May, 2024 (in 17 days)
    Posted : 7 days ago
    Started : 28 Mar, 2024 (22 days ago)

    Sheet Piling, Permanent 3015 Sft Steel Sheet Piling, Temp, Left in Place, Special 1450 Sft Steel Sheet Piling, Temp, Special 500 Sft Elec Grounding System 1 Ea Reinforcement, Steel, Epoxy Coated 2831 Lb Substructure Conc, High Performance 39 Cyd Liner, PVC, 30 mil 415 Syd Timber Bridge 1 LSUM Joint Waterproofing 160 Sft Modular Block Wall, Cap 254 Ft Modular Block Wall 1028 Sft Railroad Protection, Amtrak 20000 Dlr Curb, Conc, Det E1 735 Ft Curb

    From: Ann Arbor (City)

  • 154th Reconstruction Project – Addendum 1

    Type : Bid Notification

    Due : N/A
    Posted : 1 day ago
    Started : 03 Apr, 2024 (16 days ago)

    Enclosed is the updated demolition plan sheets and updated storm plan and profile sheets. 3. Updated Bid Form with the addition of: a. Tree Root Pruning and Treatment b. Temporary Patching c. The signs broken down to type and pay item of each. d. ASTM C-923 Rubber Boot e. Concrete Washout f. Temporary Construction Entrance g. Sod 4. Update to the Bid Form with changes in quantities to: a. Removing existing light poles and traffic signal bases b.

    From: Harvey (City)

  • Request for Quotes: Port Townsend Skatepark Lights

    Type : Bid Notification

    Due : 15 Apr, 2024 (4 days ago)
    Posted : 22 days ago
    Started : 14 Mar, 2024 (1 month ago)

    The City is interested in aluminum poles or galvanized steel for the salty sea environment. The City is interested in lights that can be manually turned on and off for evening skating. The bid should include tax, shipping and handling. The City will hire an engineer to design the installation given any instructions from the manufacturer.

    From: Port Townsend (City)

  • 2324-42 – One (1) New 3/4 Ton RWD Passenger Van (Sheriff)

    Type : Bid Notification

    Due : N/A
    Posted : 2 months ago
    Started : 12 Jan, 2024 (3 months ago)

    FOAM SYSTEM PLUMBING All piping that is in contact with the foam concentrate or foam/water solution shall be stainless steel. The fittings shall be stainless steel or brass. Cast iron pump manifolds will be allowed. Daviess County Fiscal Court- St. Joseph FD 36 of 54 MAIN PUMP INLETS A 6.00" pump manifold inlet shall be provided on each side of the vehicle.

    From: Daviess (County)