Type : Contract
FABRICATION, SUPPLY AND DELIVERY OF STEEL BRIDGE BEAMS TO YOSEMITE NATIONAL PARK. Solicitation ID/Procurement Identifier: 140P8524Q0012 Ultimate Completion Date: Thu May 30 17:00:00 GMT 2024
FABRICATION, SUPPLY AND DELIVERY OF STEEL BRIDGE BEAMS TO YOSEMITE NATIONAL PARK. Solicitation ID/Procurement Identifier: 140P8524Q0012 Ultimate Completion Date: Thu May 30 17:00:00 GMT 2024
Berens River Bridge Replacement and Associated Roadworks Project Description :Construction of a new 72 metre clear-span steel girder bridge over Berens River and associated roadworks. The bridge will replace the existing truss structure with a new approach alignment. Contact Information :-Tyler Epp 204-471-8539 Tepp@dillon.ca
The existing bridge is a single span steel beam bridge 31’-9” (+/-) long and 33’-1” (+/-) wide. The new bridge is a single span steel girder bridge, 40’-0” long and 43’-8 1⁄2” wide, with 40’-8” of clear roadway. The proposed typical section includes two 12’-0” lanes and shoulder widths that vary between 8’-0” and 8’-8”. The proposed bridge will be founded on steel H-piles.
Recycled NIGP 55753 Power and Drive Train Components and Parts, Transit Bus NIGP 55919 Communications Equipment, Train, Including Parts and Accessories NIGP 55947 Heaters, Train Track NIGP 55951 Insulation, Train NIGP 55957 Lubricators, Train Track NIGP 56039 Cranes, All Kinds, Except Automotive and Road and Bridge Building NIGP 57065 Steel Bridge Truss, Overhead NIGP 86473 Recycled Train Controls NIGP 86480 Vehicle Train Protection NIGP 91313 Construction
The project involves maintenance painting of below deck structural steel members that have been exhibiting varying degrees of paint loss and/or corrosion. Bourne Bridge is a seven span structural steel vehicular traffic truss bridge spanning across the Cape Cod Canal with a total length of about 2,400 feet. The bridge carries four lanes of vehicular traffic, two lanes in each direction into and off Cape Cod.
. #15 Furnish Prefabricated Permanent Bridge Description: The Department of Conservation and Natural Resources (DCNR), Susquehannock State Forest District 15, requires a vendor to fabricate and deliver all materials for one (1), 40’ Prefabricated bridge of structural steel in accordance with AISC specifications. Work will include, but is not limited to, furnishing all materials for the assembly of a bridge.
The project involves maintenance painting of below deck structural steel members that have been exhibiting varying degrees of paint loss and/or corrosion at the Bourne Bridge over the Cape Cod Canal in Buzzards Bay, Massachusetts. Bourne Bridge is a seven span structural steel vehicular traffic truss bridge spanning across the cape cod canal with a total length of about 2,400 feet.