Type : Bid Notification
Project Description :
Project Description :
CONTRACTOR SHALL REPLACE APPROXIMATELY 110FT OF STEEL PIPE FOR LOW PRESSURE STEAM AT THE YATES BLDG., PER THE SCOPE OF WORK. Solicitation ID/Procurement Identifier: 47PD0321A0009 Ultimate Completion Date: Tue Jul 09 17:00:00 GMT 2024
The essential portions of the proposed work are summarized as follows: bridge replacement (FSB superstructure with steel pipe piles), seawall replacement, roadway reconstruction, sidewalk reconstruction, utility relocation, and harmonization of the project to the surrounding properties.BackgroundThe Venetian Boulevard NE Bridge (Bridge No. 157186) was constructed in 1957 and services Venetian Boulevard NE over the Venetian Canal in St.
01-0L7404 Corrugated steel pipe, structural concrete headwall, remove culvert. Department of Transportation 05/21/2024 2:00PM PDT Posted
Summary DetailsThis project consists of installation of one 15.6 m concrete slab girder superstructure, on steel pipe risers and pre-cast concrete footings on the 1020 Forest Service Road (FSR). Service will include the removal of the existing 10.6 m concrete slab girder structure with associated abutment materials and transport to Ministry Storage Yard at 18km Seymour Arm FSR.
01-Men-271-2.5/18.1 *** MENDOCINO COUNTY AT VARIOUS LOCATIONS FROM 2.5 MILES NORTH OF CUMMINGS ROAD SEPARATION (ROUTE 271/101) TO 1.4 MILES SOUTH OF ROUTE 271/101 SEPARATION (PIERCY)
Replacement of four 3” diameter steel pipe columns and concrete encasement at both the Northbound and Southbound platforms. 3. Concrete Slab Construction – Casting of concrete foundations for new highblocks on the Northbound and Southbound platforms with subgrade preparation and grounding for stray current. 4. Steel Highblocks – Installation of highblocks composed of structural steel framing with Fiber Reinforced Polymer (FRP) decking. 5.