Search results for: steel valves

Showing opportunity 1 - 10 of 48
  • KLWTD Grinder Pump Lateral Kit Upgrades Project 4/10/2024

    Type : Bid Notification

    Due : 09 May, 2024 (in 13 days)
    Posted : 12 days ago
    Started : 10 Apr, 2024 (15 days ago)

    Bid Details Planholder KLWTD Grinder Pump Lateral Kit Upgrades Project 4/10/2024 Active Browse Awarded Bids Download Bid Package Bid Details Agency Name Key Largo Wastewater Treatment District Bid Writer KLWTD District Clerk's Office Bid ID ITB-2024-03-0-2024/DC Bid Type ITB - Invitation to Bid Broadcast Date 04/10/2024 4:19 PM Eastern Fiscal Year 2024 Due Date 05/09/2024 2:00 PM Eastern Bid Status Text None Additional Registration (NEW) NONE Scope of Work This invitation to Bid contemplates the provision of materials and labor to install fittings and piping needed to raise the grinder pump piping up to about 12” below grade, then install the new stainless steel valve assembly in a meter box ...... Show More Documents Download all do...

    From: Key Largo Wastewater Treatment District (Utilities)

  • GATE VALVE-CAST STEEL

    Type : Bid Notification

    Due : 22 Apr, 2024 (3 days ago)
    Posted : 3 days ago
    Started : 22 Apr, 2024 (3 days ago)

    01.GATE VALVE BODY= CAST STEEL, DISC & SEAT= STAINLESS STEEL,DN 65,CLASS 150,ASME B 16.5- 10 PC 02.GATE VALVE BODY= CAST STEEL, DISC & SEAT= STAINLESS STEEL,DN 50,CLASS 150,ASME B 16.5- 10 PC MUT BE CAST STEEL WITH STAINLESS STEEL DISC AS IT NEED TO BE USED FOR STEAM LINE3.1 MTC Number G7-Y240416006 Title GATE VALVE-CAST STEEL Available Date 22/04/2024 11:20 Due Date 23/04/2024 11:30 Contact Information Bid Type Default Bid Type

    From: ASYAD’s Drydock (Co-op)

  • City of Bruceville-Eddy - Street Repair - REBID

    Type : Bid Notification

    Due : 09 May, 2024 (in 13 days)
    Posted : 21 days ago
    Started : 20 Mar, 2024 (1 month ago)

    The term “iron and steel products” means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and Construction Materials.

    From: Tabor Associates Inc (Co-op)

  • City of Bruceville-Eddy - Customer Sewer Lines - REBID

    Type : Bid Notification

    Due : 09 May, 2024 (in 13 days)
    Posted : 21 days ago
    Started : 20 Mar, 2024 (1 month ago)

    The term “iron and steel products” means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and Construction Materials.

    From: Tabor Associates Inc (Co-op)

  • City of Bruceville-Eddy - New Wastewater Collection System - REBID

    Type : Bid Notification

    Due : 09 May, 2024 (in 13 days)
    Posted : 21 days ago
    Started : 20 Mar, 2024 (1 month ago)

    The term “iron and steel products” means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and Construction Materials.

    From: Tabor Associates Inc (Co-op)

  • City of Bruceville-Eddy - New Wastewater Treatment Plant - REBID

    Type : Bid Notification

    Due : 09 May, 2024 (in 13 days)
    Posted : 21 days ago
    Started : 20 Mar, 2024 (1 month ago)

    The term “iron and steel products” means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and Construction Materials.

    From: Tabor Associates Inc (Co-op)

  • Purchase of a Tandem Axle Trailer with 700 Gallon Dual Reel Mounted Jet Rodder for the Jefferson Parish Department of Sewerage

    Type : Bid Notification

    Due : 02 May, 2024 (in 6 days)
    Posted : 7 days ago
    Started : 17 Apr, 2024 (8 days ago)

    Pump shall be engaged at water pump/engine area. • Valves shall be hardened stainless steel disc type with stainless steel valve springs. • The fluid end shall be nickel coated. • The plungers shall be ceramic. Hardened steel shall not be accepted To prevent friction loss, the water pressure line from water pump to the hose reel shall have no swivels or elbows.

    From: Louisiana (State)