Search results for: stop bars with thermoplastic

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 128
  • Florence County Districts 3 & 9 Installation of 3 Stop Bars with Thermoplastic Material

    Type : Bid Notification

    Due : 28 Mar, 2023 (13 months ago)
    Posted : 13 months ago
    Started : 10 Mar, 2023 (13 months ago)

    Title: Florence County Districts 3 & 9 Installation of 3 Stop Bars with Thermoplastic Material Deadline: 3/28/2023 11:00 AM (UTC-05:00) Eastern Time (US & Canada) Status: Open Description: Florence County is asking for a quote for to install 3 (three) stop bars with thermoplastic material at the intersection of the Subdivision @ Sterling Drive. Problem Occurred × Please retry Ok Confirmation × Are you sure you want to remove line item?

    From: Florence (County)

  • Thermoplastic Stop Bars and Crosswalks Refresh

    Type : Bid Notification

    Due : 09 Jul, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 23 Jun, 2020 (about 3 years ago)

    The City is soliciting bids from licensed contractors to refresh thermoplastic stop bars and crosswalk markings located at selected intersections.

    From: Redmond (City)

  • Thermoplastic Stop Bars and Crosswalks Refresh Project, Redmond WA

    Type : Bid Notification

    Due : 09 Jul, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 26 Jun, 2020 (about 3 years ago)

    ID: 545251 Thermoplastic Stop Bars and Crosswalks Refresh Project, Redmond WA King CountyOwner Reference: 10700-20Bid Date:  07/09/2020 at 02:00pm Bids TodayTrades: Paving - General Engineering ContractorThe City is soliciting bids from licensed contractors to refresh thermoplastic stop bars and crosswalk markings located at selected intersections.Triston Osborne   Upgrade Membership  Upgrade Membership  Upgrade MembershipOwner:  Login or

    From: King County (County)

  • Restriping Haddock Road

    Type : Bid Notification

    Due : 03 Jan, 2024 (3 months ago)
    Posted : 4 months ago
    Started : 19 Dec, 2023 (4 months ago)

    All Restriping is to be completed using thermoplastic with reflective beads. Restriping must match current markings unless changes need to be made the meet GDOT regulations. Please advise if any changes need to be made.

    From: Kingsland (City)

  • Regional Park Pavement Marking Refurbishment

    Type : Bid Notification

    Due : 04 Aug, 2023 (8 months ago)
    Posted : 9 months ago
    Started : 27 Jul, 2023 (9 months ago)

    Download Bid Package Bid Details Agency Name City of Weston Bid Writer Steve Fabien Bid ID Bid-RFIQ 23-018-0-2023/sf Bid Type Bid - Construction Project Broadcast Date 07/27/2023 8:21 AM Eastern Fiscal Year 2023 Due Date 08/04/2023 3:00 PM Eastern Bid Status Text None Additional Registration (NEW) NONE Scope of Work Refurbish the existing double yellow, stop bars pavement markings and installation of speed limit marking in the pavement along with thermoplastic

    From: Weston (City)

  • Purchase of Thermoplastic Materials on an Annual Contract

    Type : Bid Notification

    Due : 15 Sep, 2022 (19 months ago)
    Posted : 20 months ago
    Started : 11 Aug, 2022 (20 months ago)

    Detailed Characteristics of Thermoplastic 1.

    From: Gwinnett County (County)

  • Annual Pavement Marking Projects

    Type : Bid Notification

    Due : 29 Feb, 2024 (1 month ago)
    Posted : 2 months ago
    Started : 14 Feb, 2024 (2 months ago)

    .  Thermoplastic Long Line Thermoplastic material shall comply and be placed in accordance with ADOT Specs 704. Either an alkyd or hydrocarbon thermoplastic formulation can be used for longitudinal lines (e.g. lane lines, edge lines, gore lines) unless otherwise specified. Extrude or spray formulations shall be used per the application equipment used to install the markings.

    From: Prescott (City)