Search results for: storm sewer

Refine your Search
Apply several filters to get precise search results

People also searched for

sewer cipp lining
Showing opportunity 1 - 10 of 11,462
  • 2024 Storm Sewer Lining

    Type : Bid Notification

    Due : 30 Apr, 2024 (in 11 days)
    Posted : 11 days ago
    Started : 07 Apr, 2024 (11 days ago)

    The proposed work consists of, but is not limited to, the installation of 12-inch, 15-inch, 18-inch UV cured-in-place storm sewer lining at various locations, as well as alternate items for the installation of 21-inch, 24-inch, 27-inch, 42-inch and 48-inch UV cured-in-place storm sewer lining at various locations in the City of Hudson, Ohio, in accordance with the specifications which are on file in the office of the City Engineer. 3.

    From: Hudson (City)

  • STORM SEWER INSPECTION AND CLEANING

    Type : Bid Notification

    Due : 09 May, 2024 (in 20 days)
    Posted : 7 days ago
    Started : 10 Apr, 2024 (8 days ago)

    Available Commodity Codes [022-913-77] Maintenance and Repair, Pipe Culvert [022-913-81] Maintenance and Repair, Sewer and Storm Drain, Including Removal [022-968-73] Storm Drain Cleaning, Repair, and Sludge Removal Services

    From: Manassas (City)

  • Park Point Storm Sewer Improvements

    Type : Bid Notification

    Due : 02 May, 2024 (in 13 days)
    Posted : 9 hours ago
    Started : 03 Apr, 2024 (15 days ago)

    24-99461 Park Point Storm Sewer Improvements

    From: Duluth (City)

  • TERRELL HEIGHTS STORM SEWER IMPROVEMENTS PHASE 2

    Type : Bid Notification

    Due : 26 Apr, 2024 (in 7 days)
    Posted : 9 days ago
    Started : 25 Mar, 2024 (24 days ago)

    The Project consists of storm sewer and sanitary sewer improvements within the Terrell Heights subdivision. These improvements include the installation of 335 LF of 8” HDPE pipe via pipe bursting, 30 LF of 6” PVC pipe, 680 LF of 36” RCP, 300 LF of 44” x 27” Arch RCP (36” Equivalent), one concrete headwall, six 60” junction boxes, and two 60” junction box grate inlets.

    From: Cartersville (City)

  • Hitching Post Storm Sewer and Paul Smith Way

    Type : Bid Notification

    Due : 07 May, 2024 (in 18 days)
    Posted : 9 days ago
    Started : 09 Apr, 2024 (10 days ago)

    Install storm sewer improvements at the former Hitching Post site to the storm sewer in Stinson Avenue, including final modifications and installing a permanent outlet structure to a regional detention pond. Construct approximately 970 feet of Paul Smith Way from Lincolnway to near the gymnastics facility currently under construction.

    From: Cheyenne (City)

  • 2024 Sylvania Township Trellis Way Storm Sewer Improvement

    Type : Bid Notification

    Due : 03 May, 2024 (in 14 days)
    Posted : 2 hours ago
    Started : 04 Apr, 2024 (15 days ago)

    of all materials, tools, machinery, and appliances required for the 2024 Sylvania Township Trellis Way Storm Sewer Improvement.

    From: Lucas County Engineer (County)

  • STORM SEWER CLEAING AND NSPECTION – ELGIN C-STORE

    Type : Bid Notification

    Due : 02 May, 2024 (in 13 days)
    Posted : 1 hour ago
    Started : 04 Apr, 2024 (15 days ago)

    PURPOSE: The Minnesota Pollution Control Agency (MPCA) intends to hire a contractor for storm sewer cleaning and inspection at Cenex convenience store in Elgin, Minnesota. LOCATION OF WORK: 15 2nd Ave NE, Elgin, MN 55932 MANDATORY PRE-BID MEETING: April 24, 2024, 10:00 AM LOCATION: Elgin Cenex C-Store 15 2nd Ave NE, Elgin, MN 55932 QUESTIONS DEADLINE: April 29, 2024, 2:00 PM, Central Time PROJECT COMPLETION DATE: June 30, 2024 ATTACHMENTS.

    From: Minnesota (State)