Search results for: stormwater and roadway improvements

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 389
  • Stormwater Roadway Improvements Roswell Transfer..

    Type : Bid Notification

    Due : 29 Aug, 2023 (8 months ago)
    Posted : 8 months ago
    Started : 28 Jul, 2023 (9 months ago)

    and Storm Drain91381Maintenance and Repair, Sewer and Storm Drain, Including Removal91395Paving and Resurfacing, Highway and Road

    From: Georgia (State)

  • STORMWATER ROADWAY IMPROVEMENTS ROSWELL TRANSFER STATION

    Type : Bid Notification

    Due : 29 Aug, 2023 (8 months ago)
    Posted : 9 months ago
    Started : 28 Jul, 2023 (9 months ago)

    UNSPSC 721410 Highway and road construction services: The buildingand repair of highways and streets owned by others UNSPSC 721411 Infrastructure building and surfacing and paving services: The building, surfacing or paving either new or in repair of infrastructure owned by others UNSPSC 831015 Water and sewer utilities UNSPSC 72141103 Highway and road paving service: The paving of highways and roads owned by others

    From: Roswell (City)

  • INVITATION TO BID No.: 07-22/23 CONSTRUCTION OF OAKWOOD DRIVE AND EAST DRIVE STORMWATER AND ROADWAY IMPROVEMENTS PROJECT

    Type : Bid Notification

    Due : 10 Jul, 2023 (9 months ago)
    Posted : 11 months ago
    Started : 26 Jun, 2023 (10 months ago)

    The Project is intended to provide water quality, stormwater management, roadway and landscape improvements and beautification along the East Drive corridor from NW 36th Street on the south to South Royal Poinciana Boulevard on the north, as well as drainage improvements in Stafford Park and along Oakwood Drive (the “Project Area”).

    From: Miami Springs (City)

  • Sand Hill Stormwater & Roadway Improvement Project

    Type : Bid Notification

    Due : 20 Jun, 2023 (10 months ago)
    Posted : 11 months ago
    Started : 23 May, 2023 (11 months ago)

    Required professional services will include but are not limited to preliminary engineering services, design- and construction-related services, preparation of bidding and contract documents, participation in the evaluation of bids received, and monitoring and inspection of construction activities to ensure compliance with plans and specifications associated for the Town of Bethel’s Sand Hill Stormwater and Roadway Improvements project.

    From: Vermont (State)

  • Sand Hill Stormwater & Roadway Improvement Project

    Type : Bid Notification

    Due : 20 Jun, 2023 (10 months ago)
    Posted : 11 months ago
    Started : 23 May, 2023 (11 months ago)

    Required professional services will include but are not limited to preliminary engineering services, design- and construction-related services, preparation of bidding and contract documents, participation in the evaluation of bids received, and monitoring and inspection of construction activities to ensure compliance with plans and specifications associated for the Town of Bethel’s Sand Hill Stormwater and Roadway Improvements project.

    From: Vermont (State)

  • ITB No. 08-22/23 for Construction of the Oakwood Drive and East Drive Stormwater and Roadway Improvement Project.

    Type : Bid Notification

    Due : 14 Sep, 2023 (7 months ago)
    Posted : 8 months ago
    Started : 31 Aug, 2023 (8 months ago)

    The Project is intended to provide water quality, stormwater management, roadway and landscape improvements and beautification along the East Drive corridor from NW 36th Street on the south to South Royal Poinciana Boulevard on the north, as well as drainage improvements in Stafford Park and along Oakwood Drive (the “Project Area”).

    From: Miami Springs (City)

  • 2024 19 Rd. Improvements Project

    Type : Bid Notification

    Due : 10 May, 2024 (in 11 days)
    Posted : 12 days ago
    Started : 01 Apr, 2024 (27 days ago)

    Work includes, but is not limited to, traffic control, the modification of existing and installation of ±1,250’ of new domestic water line and fittings, ±4,200’ of sanitary sewer line, ±5,000’ of storm drain line, ±2,500’ of irrigation line, inlets, manholes and diversion boxes, removal of an existing canal box culvert, installation of ±150’ of new cast-in-place canal box culvert, stormwater BMP installation & maintenance, earthwork, grading, road

    From: Fruita (City)