Type : Bid Notification
The work includes but is not limited to erosion and sediment controls, stripping and subgrade preparation, installation of interim and final cover systems consisting of cover soil, geomembrane and other materials, drainage, installation of landfill gas system components, vertical wells, conveyance piping, stormwater ditches, and a contaminated stormwater flap, excavation, and stockpile removal. Addendum Description Addendum 1 has been issued.