Type : Contract
STRIPING NO LOAD ZONE ON SHIPWAYS TASK ORDER. Solicitation ID/Procurement Identifier: 70Z04020D62153Y00 Ultimate Completion Date: Tue Jul 05 17:00:00 GMT 2022
STRIPING NO LOAD ZONE ON SHIPWAYS TASK ORDER. Solicitation ID/Procurement Identifier: 70Z04020D62153Y00 Ultimate Completion Date: Tue Jul 05 17:00:00 GMT 2022
LOAD DATA UTILIZED SHALL INCLUDE EXISTING AND PROPOSED LOADS OBTAINED FROM CONTRACT DOCUMENTS. D. IF APPLICABLE, INCLUDE FAULT CONTRIBUTION OF EXISTING MO...
, 5, EA;LI 002: Gerber Outerwear ANSI Pro Dry Rain Jacket SIZE MEDIUM PRODUCT SPECS ANSI 107:2010 Class 3 Waterproof 3MTM Scotchlite reflective striping Side equipment access with VELCRO® brand closures Elasticized adjustable cuffs Badge tab on right chest Reversible Hip length, 15, EA;LI 003: Gerber Outerwear ANSI Pro Dry Rain Jacket SIZE LARGE PRODUCT SPECS ANSI 107:2010 Class 3 Waterproof 3MTM Scotchlite reflective striping Side equipment access
Bidders submitting bids through the E-bid System shall scan and up-load a copy of their Bid Security (sealed Bid Bond, Certified Check or Cashier’s Check ) as an attachment to their electronic bid. Original documents for Bid Security will be requested by the City from the lowest two bidders and delivered to the City’s Purchasing Buyer within 48 business hours of the Bid Opening.
The Alaska Department of Transportation and Public Facilities (DOT&PF) has assumed the responsibilities of the Federal Highway Administration under 23 U.S.C. 327 and is soliciting comments and information on a project to construct a flashing beacon and load center at the intersection of Church Road and Spruce Avenue near Wasilla, Alaska.
The Engineer/Architect's approval shall be obtained before cutting or drilling holes in concrete or masonry that tend to damage or weaken the load capacity. V.
Provide new pavement markings and striping. Reuse of portions of the existing fuel hydrant system piping where possible within the apron area with the remainder being removed from service and abandoned in place by grouting. Adequately sized existing supply and return piping between the fuel farm area and apron will be reused.